Optimal policies for vendor-buyer inventory system involving defective items with variable lead time and service level constraint

This paper investigates a single-vendor-single-buyer production inventory model involving defective items in both an individual and joint management system with service level constraint. In the system under study, the vendor produces a product in a batch with finite production rate and transfers the lot in equal size to the buyer facing stochastic demand, which is assumed to be normally distributed. The lead time can be reduced by added crashing cost. Moreover, the backorder rate is dependent on the length of lead time through the amount of shortages and the lead time and ordering cost reduction are interacted. A model has been formulated to minimise the joint total expected cost and individual total expected cost by simultaneously optimising order quantity, lead time, and the number of lots delivered from the vendor to the buyer for joint and individual management system respectively. For each model, an effective iterative procedure is developed to identify the optimal solutions. Numerical examples are provided to illustrate the algorithmic procedure and the effects of key parameters are studied for both systems.

[1]  K. S. Chaudhuri,et al.  An imperfect production process for time varying demand with inflation and time value of money - An EMQ model , 2011, Expert Syst. Appl..

[2]  Chao-Kuei Huang An integrated vendor-buyer cooperative inventory model for items with imperfect quality , 2002 .

[3]  S. Goyal,et al.  Integrated inventory models: The buyer-vendor coordination , 1989 .

[4]  Wen-Chuan Lee,et al.  Inventory model involving controllable backorder rate and variable lead time demand with the mixtures of distribution , 2005, Appl. Math. Comput..

[5]  Yu-Jen Lin,et al.  An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost , 2009, Comput. Ind. Eng..

[6]  C. Glock The joint economic lot size problem: A review , 2012 .

[7]  L. Ouyang,et al.  Mixture inventory model involving variable lead time and controllable backorder rate , 2001 .

[8]  Fei Ye,et al.  Cost allocation model for optimizing supply chain inventory with controllable lead time , 2010, Comput. Ind. Eng..

[9]  Patrick S. Chen,et al.  Improved inventory models with service level and lead time , 2005, Comput. Oper. Res..

[10]  Jason Chao-Hsien Pan,et al.  Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .

[11]  R. Uthayakumar,et al.  Controlling setup cost in (Q, r, L) inventory model with defective items , 2010 .

[12]  Christoph H. Glock,et al.  Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand , 2012 .

[13]  M. A. Hoque,et al.  An alternative model for integrated vendor–buyer inventory under controllable lead time and its heuristic solution , 2007, Int. J. Syst. Sci..

[14]  Ching-Shih Tsou,et al.  Evolutionary Pareto optimizers for continuous review stochastic inventory systems , 2009, Eur. J. Oper. Res..

[15]  Fei Ye,et al.  Supply chain coordination model with controllable lead time and service level constraint , 2011, Comput. Ind. Eng..

[16]  L. Ouyang,et al.  An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .

[17]  Manoranjan Maiti,et al.  Multi-objective inventory models of deteriorating items with some constraints in a fuzzy environment , 1998, Comput. Oper. Res..

[18]  Biswajit Sarkar,et al.  An inventory model with reliability in an imperfect production process , 2012, Appl. Math. Comput..

[19]  Liang-Yuh Ouyang,et al.  Mixture inventory model involving variable lead time with a service level constraint , 1997, Comput. Oper. Res..

[20]  L. Ouyang,et al.  Analysis of optimal vendor-buyer integrated inventory policy involving defective items , 2006 .

[21]  Wen-Chuan Lee,et al.  Computational algorithmic procedure for optimal inventory policy involving ordering cost reduction and back-order discounts when lead time demand is controllable , 2007, Appl. Math. Comput..

[22]  Ilkyeong Moon,et al.  An EPQ model with inflation in an imperfect production system , 2011, Appl. Math. Comput..

[23]  Hardik N. Soni,et al.  Optimal strategy for an integrated inventory system involving variable production and defective items under retailer partial trade credit policy , 2012, Decis. Support Syst..

[24]  Kripa Shanker,et al.  Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints , 2013 .

[25]  Liang-Yuh Ouyang,et al.  Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..

[26]  Chia-Huei Ho,et al.  A Minimax Distribution Free Procedure for an Integrated Inventory Model with Defective Goods and Stochastic Lead Time Demand , 2009 .

[27]  Abdul Raouf,et al.  Inventory Models Involving Lead Time as a Decision Variable , 1994 .

[28]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .

[29]  Wen-Chuan Lee,et al.  Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate , 2006, Appl. Math. Comput..

[30]  L. Ouyang,et al.  Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .

[31]  Tai-Yue Wang,et al.  An inventory control system for products with optional components under service level and budget constraints , 2008, Eur. J. Oper. Res..

[32]  Manoranjan Maiti,et al.  A multi-objective wholesaler–retailers inventory-distribution model with controllable lead-time based on probabilistic fuzzy set and triangular fuzzy number , 2008 .

[33]  Kripa Shanker,et al.  Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..

[34]  L. Ouyang,et al.  Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .

[35]  Parviz Fattahi,et al.  Integrated vendor–buyer cooperative inventory model with controllable lead time, ordering cost reduction, and service-level constraint , 2013 .

[36]  Shib Sankar Sana,et al.  An economic production quantity model with stochastic demand in an imperfect production system , 2011 .

[37]  Jason Chao-Hsien Pan,et al.  A study of an integrated inventory with controllable lead time , 2002 .

[38]  Seyed Reza Hejazi,et al.  Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period , 2012, Comput. Ind. Eng..

[39]  Chia-Hsien Su Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit , 2012 .

[40]  Suresh Kumar Goyal,et al.  A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer , 2006 .

[41]  Liang-Yuh Ouyang,et al.  A continuous review inventory model with ordering cost dependent on lead time , 2001 .