Simulation Based Clearing Functions For A Model Of Order Release Planning
暂无分享,去创建一个
[1] Armin Scholl,et al. Robuste Planung und Optimierung , 2001 .
[2] R. Uzsoy,et al. An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms , 2012, IEEE Transactions on Semiconductor Manufacturing.
[3] David D. Yao,et al. A Supply Network Model with Base-Stock Control and Service Requirements , 2000, Oper. Res..
[4] Frank Herrmann. Operative Planung in IT-Systemen für die Produktionsplanung und -steuerung , 2011 .
[5] Reha Uzsoy,et al. An Exploratory Analysis of Two Iterative Linear Programming—Simulation Approaches for Production Planning , 2010, IEEE Transactions on Semiconductor Manufacturing.
[6] Reha Uzsoy,et al. Planning Production and Inventories in the Extended Enterprise , 2011 .
[7] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[8] Joseph A. Orlicky,et al. Material Requirements Planning: The New Way of Life in Production and Inventory Management , 1975 .
[9] Matthias Lautenschläger,et al. Modelling lead times depending on capacity utilization , 1998 .
[10] Reha Uzsoy,et al. Production planning with resources subject to congestion , 2009 .
[11] F. Lange,et al. Belastungsorientierte Ansätze in der Produktionsplanung , 2021, Produktionsplanung und -steuerung.
[12] R. Uzsoy,et al. Tractable nonlinear production planning models for semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.
[13] Robert J. Vanderbei,et al. Robust Optimization of Large-Scale Systems , 1995, Oper. Res..
[14] Arnoldo C. Hax,et al. Hierarchical integration of production planning and scheduling , 1973 .
[15] M. D. Byrne,et al. Production planning using a hybrid simulation – analytical approach , 1999 .
[16] R. C. Leachman,et al. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations , 1996 .
[17] David L. Woodruff,et al. Production planning with load dependent lead times: an update of research , 2007, Ann. Oper. Res..
[18] Sooyoung Kim,et al. Extended model for a hybrid production planning approach , 2001 .
[19] David L. Woodruff,et al. Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .
[20] Reha Uzsoy,et al. Estimating clearing functions from simulation data , 2010, Proceedings of the 2010 Winter Simulation Conference.
[21] Laureano F. Escudero,et al. Production planning via scenario modelling , 1993, Ann. Oper. Res..
[22] Jan Karel Lenstra,et al. Linear programming models with planned lead times for supply chain operations planning , 2005, Eur. J. Oper. Res..
[23] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[24] Hubert Missbauer,et al. Aggregate order release planning for time-varying demand , 2002 .
[25] A. Srinivasan,et al. Resource Pricing And Aggregate Scheduling In Manufacturing Systems , 1988 .
[26] Angappa Gunasekaran,et al. Waiting line model applications in manufacturing , 1998 .
[27] David L. Woodruff,et al. Production planning with load dependent lead times , 2005, 4OR.
[28] Stephen C. Graves,et al. A Tactical Planning Model for a Job Shop , 1986, Oper. Res..
[29] Robert C. Leachman,et al. A general framework for modeling production , 1989 .
[30] Reha Uzsoy,et al. Production planning with loaddependent lead times and safety stocks for a single product , 2011 .