Time/cost trade-offs in project scheduling with time-switch and resource constraints
暂无分享,去创建一个
[1] F. Farshi Jalali,et al. Optimization of construction time-cost trade-off analysis using genetic algorithms , 2011 .
[2] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[3] Erik Demeulemeester,et al. Project network models with discounted cash flows a guided tour through recent developments , 1997, Eur. J. Oper. Res..
[5] Luís Vladares Tavares,et al. A review of the contribution of Operational Research to Project Management , 2002, Eur. J. Oper. Res..
[6] He Zheng-wen. Resource-constrained Max-npv project scheduling problem and branch and bound algorithm , 2009 .
[7] Tarek Hegazy. Optimization of construction time-cost trade-off analysis using genetic algorithms , 1999 .
[8] A. H. Russell. Cash Flows in Networks , 1970 .
[9] Xu Yu,et al. Discrete Time/Cost Trade-offs in Project Scheduling with Time-switch Constraints , 2006 .
[10] Rema Padman,et al. An integrated survey of deterministic project scheduling , 2001 .