BIM implementation throughout the UK construction project lifecycle: An analysis

Substantial impacts through BIM implementation may be achieved throughout all stages of the construction process. The paper measures BIM use throughout the project lifecycle, confirming BIM is most often used in the early stages with progressively less use in the latter stages. This research demonstrates via 92 responses from a sample of BIM users that collaboration aspects produce the highest positive impact. The process aspects are more important than the software technology. BIM necessitates investment in software and training however, smaller practices can afford it. Stakeholder financial benefits are ranked concluding that clients benefit most financially from BIM followed by Facilities Managers. Despite this, over 70% do not provide a 3D model and Cobie dataset at the conclusion of a project. Identification of Key Performance Indicators currently being used for BIM is provided and findings indicate a lack of industry expertise and training providing an opportunity for education providers.

[1]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[2]  Qiming Li,et al.  Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money , 2009 .

[3]  Salman Azhar,et al.  Building information modeling for sustainable design and LEED® rating analysis , 2011 .

[4]  R. Sebastian Breaking through business and legal barriers of open collaborative processes based on building information modelling (BIM) , 2010 .

[5]  Dean Kashiwagi,et al.  Best Value Solution Designed in a Developing Country , 2012 .

[6]  Jae-Jun Kim,et al.  A Study on Application of BIM (Building Information Modeling) to Pre-design in Construction Project , 2008, 2008 Third International Conference on Convergence and Hybrid Information Technology.

[7]  Karen Kensek Building Information Modeling , 2014 .

[8]  Robert J. Krawczyk,et al.  Two Approaches to BIM: A Comparative Study , 2004 .

[9]  Burcu Akinci,et al.  Automatic Reconstruction of As-Built Building Information Models from Laser-Scanned Point Clouds: A Review of Related Techniques | NIST , 2010 .

[10]  Brian Okorn,et al.  Methods for Automatically Modeling and Representing As-built Building Information Models , 2011 .

[11]  Ricardo Jardim-Goncalves,et al.  Challenging electronic procurement in the AEC sector: A BIM-based integrated perspective , 2011 .

[12]  Mohamed Marzouk,et al.  On the use of Building Information Modeling in Infrastructure Bridges , 2010 .

[13]  Pavan Meadati,et al.  Integrating Construction Process Documentation into Building Information Modeling , 2008 .

[14]  Kihong Ku,et al.  BIM Experiences and Expectations: The Constructors' Perspective , 2011 .

[15]  Rob Howard,et al.  Building information modelling - Experts' views on standardisation and industry deployment , 2008, Adv. Eng. Informatics.

[16]  Van Truong Luu,et al.  Improving project management performance of large contractors using benchmarking approach , 2008 .

[17]  Tahar Kouide,et al.  BIM as a Viable Collaborative Working Tool: A Case Study , 2007 .

[18]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[19]  Keith E. Hedges,et al.  From CAD to BIM: Educational Strategies for the Coming Paradigm Shift , 2008 .

[20]  Sharon A. Christensen,et al.  Legal and Contracting Issues in Electronic Project Administration in the Construction Industry , 2007 .

[21]  Salman Azhar,et al.  BIM for Sustainability Analyses , 2009 .

[22]  David A. Duce,et al.  Early stage multi-level cost estimation for schematic BIM models , 2012 .

[23]  Salman Azhar,et al.  Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry , 2011 .

[24]  Mike Kagioglou,et al.  Technology adoption in the BIM implementation for lean architectural practice , 2011 .

[25]  Peter Demian,et al.  Benefits and barriers of building information modelling , 2008 .

[26]  Willem Kymmell,et al.  Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations , 2007 .

[27]  Christophe Cruz,et al.  IFC and building lifecycle management , 2008 .

[28]  Ricardo Jardim-Goncalves,et al.  SOA4BIM: Putting the building and construction industry in the Single European Information Space , 2010 .

[29]  Ricardo Jardim-Goncalves,et al.  Value proposition on interoperability of BIM and collaborative working environments , 2010 .

[30]  Ray Crotty,et al.  The Impact of Building Information Modelling: Transforming Construction , 2011 .

[31]  Dominic Holzer,et al.  ARE YOU TALKING TO ME? WHY BIM ALONE IS NOT THE ANSWER , 2007 .

[32]  Raja R. A. Issa,et al.  BIM Use and Requirements among Building Owners , 2012 .

[33]  Oluwole Alfred Olatunji,et al.  A preliminary review on the legal implications of BIM and model ownership , 2011, J. Inf. Technol. Constr..

[34]  Janis Birkeland,et al.  Eco-retrofitting with building integrated living systems , 2009 .

[35]  Alan Hore,et al.  ADVANCING THE USE OF BIM THROUGH A GOVERNMENT FUNDED CONSTRUCTION INDUSTRY COMPETENCY CENTRE IN IRELAND , 2011 .

[36]  Nawari O. Nawari BIM Standard in Off-Site Construction , 2012 .

[37]  Craig W. Furneaux,et al.  BIM – implications for government , 2008 .

[38]  Martin Fischer,et al.  Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..

[39]  Thayaparan Gajendran,et al.  A case study of the effects of attitude, behaviour, and project team culture on building information model use in a temporary project organisation , 2010 .

[40]  Burcin Becerik-Gerber,et al.  The perceived value of building information modeling in the U.S. building industry , 2010, J. Inf. Technol. Constr..

[41]  Salman Azhar,et al.  Building information modelling (BIM): now and beyond , 2012 .