Too big to change: How heterogeneous firms respond to time-of-use electricity price

[1]  K. Arrow,et al.  Capital-labor substitution and economic efficiency , 1961 .

[2]  K. Sato A Two-Level Constant-Elasticity-of-Substitution Production Function , 1967 .

[3]  E. Berndt,et al.  Technology, Prices, and the Derived Demand for Energy , 1975 .

[4]  Industrial and Commercial Demand for Electricity by Time-of-Day: A California Case Study , 1981 .

[5]  Roger Koenker,et al.  Costs and benefits of peak-load pricing of electricity: A continuous-time econometric approach , 1984 .

[6]  Dennis J. Aigner,et al.  Commercial/Industrial Customer Response to Time-Of-Use Electricity Prices: Some Experimental Results , 1985 .

[7]  D. Aigner,et al.  The Residential Electricity Time-of-Use Pricing Experiments: What Have We Learned? , 1985 .

[8]  Douglas W. Caves,et al.  The Response of Industrial Customers to Electric Rates Based Upon Dynamic Marginal Costs , 1993 .

[9]  Chuin-Shan Chen,et al.  Time-of-use pricing for load management programs in Taiwan Power Company , 1994 .

[10]  A. Atkeson,et al.  Models of Energy Use: Putty-Putty Versus Putty-Clay , 1994 .

[11]  Dennis J. Aigner,et al.  The Response of Small and Medium-Size Business Customers to Time-of-Use (TOU) Electricity Rates in Israel , 1994 .

[12]  F. Wolak,et al.  Estimating the Customer-Level Demand for Electricity Under Real-Time Market Prices , 2001 .

[13]  Shana L. Dardan,et al.  INDUSTRIAL RESPONSE TO ELECTRICITY REAL‐TIME PRICES: SHORT RUN AND LONG RUN , 2002 .

[14]  Thomas N. Taylor,et al.  24/7 Hourly Response to Electricity Real-Time Pricing with up to Eight Summers of Experience , 2005 .

[15]  M. Lijesen The real-time price elasticity of electricity , 2007 .

[16]  Anindya Sen,et al.  Response of industrial customers to hourly pricing in Ontario’s deregulated electricity market , 2011 .

[17]  Jin-ho Kim,et al.  Common failures of demand response , 2011 .

[18]  Sebastian Calonico,et al.  Robust Nonparametric Confidence Intervals for Regression‐Discontinuity Designs , 2014 .

[19]  Y. Wang,et al.  Time-of-use electricity pricing for industrial customers: A survey of U.S. utilities , 2015 .

[20]  Katrina Jessoe,et al.  Commercial and Industrial Demand Response Under Mandatory Time‐Of‐Use Electricity Pricing , 2015 .

[21]  P. Pinotti Clicking on Heaven's Door: The Effect of Immigrant Legalization on Crime , 2014 .

[22]  Kenta Tanaka,et al.  Energy Conservation and Risk of Electric Outage: Laboratory Experimental Study , 2017 .

[23]  Ping Qin,et al.  The effect of subway expansions on vehicle congestion: Evidence from Beijing , 2018 .

[24]  S. Managi,et al.  Decomposition analysis of sustainable green technology inventions in China , 2019, Technological Forecasting and Social Change.