In classical approach, production scheduling and warehouse logistics operations are investigated separately while making production scheduling without considering the warehouse logistics operations. Unlike classical approach, this paper studies an integrated production scheduling and coil shuffling problem, which is to create a production scheduling with considering production scheduling constraints and shuffling logistics operation. The problem is motivated by pickling-rolling practical production in the steel industry where selection and sequence of coils need not only considering the changeovers cost between adjacent coils, but also coil shuffling cost in retrieving coil. The objective is to minimize the overall production scheduling cost and shuffling cost. A tabu search based algorithm is developed where a two-phase heuristics is proposed to act the initial feasible solutions of tabu search. Computational results show that integrated approach of production scheduling and coil shuffling may reduce the total cost by 17% on average, compared with separate approach.
[1]
M. Wasner,et al.
Warehouse sequencing in the steel supply chain as a generalized job shop model
,
2006
.
[2]
Andrew J. Davenport,et al.
Finishing Line Scheduling in the steel industry
,
2004,
IBM J. Res. Dev..
[3]
Michel Gendreau,et al.
The hot strip mill production scheduling problem: A tabu search approach
,
1998,
Eur. J. Oper. Res..
[4]
Lixin Tang,et al.
Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules
,
2002
.
[5]
Lixin Tang,et al.
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex
,
2000,
Eur. J. Oper. Res..