The Effects of Articulated Buses on Dwell and Running Times
暂无分享,去创建一个
[1] Herbert S Levinson,et al. ANALYZING TRANSIT TRAVEL TIME PERFORMANCE , 1983 .
[2] Mark D. Abkowitz,et al. FACTORS AFFECTING RUNNING TIME ON TRANSIT ROUTES , 1983 .
[3] Avishai Ceder,et al. Public Transit Planning and Operation , 2007 .
[4] Robert L. Bertini,et al. Generating Transit Performance Measures with Archived Data , 2003 .
[5] Robert L. Bertini,et al. Door-to-Door Mobility: Evaluating a Bus Rapid Transit Community Transport Concept , 2002 .
[6] Ahmed El-Geneidy,et al. Limited-stop bus service: an evaluation of an implementation strategy , 2010, Public Transp..
[7] Ahmed M El-Geneidy,et al. Empirical Analysis of the Effects of Bus Stop Consolidation on Passenger Activity and Transit Operations , 2005 .
[8] Robert L. Bertini,et al. Analysis of Transit Signal Priority Using Archived TriMet Bus Dispatch System Data , 2005 .
[9] James G. Strathman. Tri-Met's Experience With Automatic Passenger Counter and Automatic Vehicle Location Systems , 2002 .
[10] James T. Jarzab,et al. Characteristics of Bus Rapid Transit Projects: An Overview , 2002 .
[11] Ichiro Kageyama,et al. Steering control for advanced guideway bus system with all-wheel steering system , 2006 .
[12] Robert L. Bertini,et al. Beyond Generating Transit Performance Measures , 2009 .
[13] Kumares C. Sinha,et al. MODELING BUS DELAYS DUE TO PASSENGER BOARDINGS AND ALIGHTINGS , 1983 .
[14] Steve Callas,et al. Evaluation of transit operations: data applications of Tri-Met's automated Bus Dispatching System , 2002 .
[15] Ahmed M El-Geneidy,et al. Estimating Bus Run Times for New Limited-Stop Service Using Archived AVL and APC Data , 2009 .
[16] Mark D. Abkowitz,et al. Research contributions to managing transit service reliability , 1987 .
[17] Brendon Hemily,et al. Uses of Higher Capacity Buses in Transit Service , 2008 .
[18] Herbert S Levinson,et al. Bus Rapid Transit: An Overview , 2002 .
[19] Robert L. Bertini,et al. Modeling schedule recovery processes in transit operations for bus arrival time prediction , 2004 .
[20] Herbert S Levinson. Bus Transit in the 21st Century: Some Perspectives and Prospects , 2001 .
[21] Carlos F. Daganzo,et al. A headway-based approach to eliminate bus bunching: Systematic analysis and comparisons , 2009 .
[22] Upali Vandebona,et al. THE EFFECTS OF FARE-COLLECTION STRATEGIES ON TRANSIT LEVEL OF SERVICE , 1985 .
[23] Kevin J. Krizek,et al. Segmenting preferences and habits of transit users and non-users , 2007 .
[24] James G. Strathman,et al. Empirical analysis of bus transit on-time performance☆ , 1993 .
[25] Steve Callas,et al. DETERMINANTS OF BUS DWELL TIME , 2004 .
[26] Kevin J. Krizek,et al. Analyzing Transit Service Reliability Using Detailed Data from Automatic Vehicular Locator Systems , 2008 .
[27] Vukan R Vuchic,et al. Urban Transit : Operations, Planning and Economics , 2005 .
[28] Jonathan Levine,et al. DWELL-TIME EFFECTS OF LOW-FLOOR BUS DESIGN , 1994 .
[29] James G. Strathman,et al. SERVICE RELIABILITY IMPACTS OF COMPUTER-AIDED DISPATCHING AND AUTOMATIC VEHICLE LOCATION TECHNOLOGY: A TRI-MET CASE STUDY , 1999 .
[30] Per Capita,et al. About the authors , 1995, Machine Vision and Applications.
[31] David A. Hensher,et al. THE FUTURE OF EXCLUSIVE BUSWAYS: THE BRAZILIAN EXPERIENCE. , 1998 .