A new approach to job shop-scheduling problem
暂无分享,去创建一个
[1] Yan Wang,et al. Manufacturing project management in the conglomerate enterprises supported by IDSS , 2009 .
[2] J. Madejski. Survey of the agent-based approach to intelligent manufacturing , 2007 .
[3] Gilmar Ferreira Batalha,et al. Integrated product and process system with continuous improvement in the auto parts industry , 2009 .
[4] Kostas S. Metaxiotis,et al. An Object-Oriented Analysis and Design of a Model for Production Planning and Control in Industry , 2001 .
[5] Takeshi Yamada,et al. Scheduling by Genetic Local Search with Multi-Step Crossover , 1996, PPSN.
[6] A. S. Jain,et al. Job-shop scheduling using neural networks , 1998 .
[7] Reha Uzsoy,et al. A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems , 1997, J. Heuristics.
[8] Marco Dorigo,et al. Ant system for Job-shop Scheduling , 1994 .
[9] Franci Cus,et al. Intelligent approach for optimal modeling of manufacturing systems , 2006 .
[10] Guoyong Shi,et al. A genetic algorithm applied to a classic job-shop scheduling problem , 1997, Int. J. Syst. Sci..
[11] Peter Brucker,et al. Improving Local Search Heuristics for some Scheduling Problems. Part II , 1996, Discret. Appl. Math..
[12] D. Szewieczek,et al. Computer-assisted the optimisation of technological process , 2009 .
[13] Peter Brucker,et al. A Branch and Bound Algorithm for the Job-Shop Scheduling Problem , 1994, Discret. Appl. Math..
[14] Takeshi Yamada,et al. Job-Shop Scheduling by Simulated Annealing Combined with Deterministic Local Search , 1996 .