건축공사의 공기단축법에 있어서 MCX법과 SAM법의 비교 분석에 관한 연구
暂无分享,去创建一个
Contractor must shorten duration when the planned construction schedule is more long than target schedule, when progress of construction is delayed to target schedule.The purpose of this study is to compare and analyze the problems of application and the difference of results of MCX and SAM in duration shortening method.