Joint production and subcontracting planning of unreliable multi-facility multi-product production systems
暂无分享,去创建一个
[1] Rupert Booth. The role of supply‐chain re‐engineering in the pharmaceutical industry , 1996 .
[2] R. Suri,et al. Time-optimal control of parts-routing in a manufacturing system with failure-prone machines , 1980, 1980 19th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[3] Angus Jeang. Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown , 2012 .
[4] Xiaolan Xie,et al. Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay , 2008 .
[5] Robert Pellerin,et al. Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system , 2013 .
[6] Sherman X. Bai,et al. Scheduling of an unreliable manufacturing system with nonresumable setups , 1997 .
[7] Felix T. S. Chan,et al. Independence of the hedging points in PHP control policy , 2014, J. Oper. Res. Soc..
[8] Ali Gharbi,et al. Joint production and setup control policies: an extensive study addressing implementation issues via quantitative and qualitative criteria , 2014 .
[9] Marcos Singer,et al. Quality strategies in supply chain alliances of disposable items , 2003 .
[10] J. Banks,et al. Discrete-Event System Simulation , 1995 .
[11] Jean-Pierre Kenné,et al. Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups , 2006 .
[12] Chung-Yuan Dye,et al. The effect of preservation technology investment on a non-instantaneous deteriorating inventory model , 2013 .
[13] Nidhal Rezg,et al. Preventive maintenance of manufacturing systems under environmental constraints , 2007 .
[14] Houmin Yan,et al. Optimal production control in a discrete manufacturing system with unreliable machines and random demands , 2000, IEEE Trans. Autom. Control..
[15] Ali Gharbi,et al. A comparative study of pull control mechanisms for unreliable homogenous transfer lines , 2010 .
[16] Børge Obel,et al. Tactical coordination in a multi-location and multi-stage operations structure: A model and a pharmaceutical company case☆ , 2007 .
[17] Ali Gharbi,et al. Production planning problem in manufacturing systems with general failure and repair time distributions , 2000 .
[18] Ali Gharbi,et al. Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell , 2011 .
[19] I Gede Agus Widyadana,et al. A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule , 2013 .
[20] Lars Mönch,et al. Simulation-based performance assessment of master planning approaches in semiconductor manufacturing , 2014 .
[21] R. Rishel. Dynamic Programming and Minimum Principles for Systems with Jump Markov Disturbances , 1975 .
[22] Bibhas C. Giri,et al. Production lot sizing with process deterioration and machine breakdown under inspection schedule , 2009 .
[23] Moshe Dror,et al. Deux Chemicals Inc. Goes Just-in-Time , 2009, Interfaces.
[24] Peter Whittle,et al. Optimal Control: Basics and Beyond , 1996 .
[25] Michael C. Caramanis,et al. Near optimal manufacturing flow controller design , 1991 .
[26] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[27] Rezg Nidhal,et al. Joint optimisation of maintenance and production policies considering random demand and variable production rate , 2012 .
[28] Ali Gharbi,et al. Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell , 2012 .
[29] R. Akella,et al. Optimal control of production rate in a failure prone manufacturing system , 1985, 1985 24th IEEE Conference on Decision and Control.
[30] S. Sethi,et al. Average-Cost Optimal Policies for an Unreliable Flexible Multiproduct Machine , 2008 .
[31] A. Sharifnia,et al. Production control of a manufacturing system with multiple machine states , 1988 .
[32] Ali Gharbi,et al. Production rate control of an unreliable manufacturing cell with adjustable capacity , 2011 .
[33] Ali Gharbi,et al. Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems , 2003 .