Resource-constrained Hierarchical Task Network planning under uncontrollable durations for emergency decision-making

[1]  Hector Muñoz-Avila,et al.  Hierarchical task network planning with resources and temporal constraints , 2017, Knowl. Based Syst..

[2]  Hongwei Wang,et al.  HTN planning with uncontrollable durations for emergency decision-making , 2017, J. Intell. Fuzzy Syst..

[3]  Jian Wang,et al.  Hierarchical task network-based emergency task planning with incomplete information, concurrency and uncertain duration , 2016, Knowl. Based Syst..

[4]  Patrick Doherty,et al.  Efficient processing of simple temporal networks with uncertainty: algorithms for dynamic controllability verification , 2016, Acta Informatica.

[5]  Marco Aiello,et al.  HTN planning: Overview, comparison, and beyond , 2015, Artif. Intell..

[6]  Roman Barták,et al.  Planning and Acting with Temporal and Hierarchical Decomposition Models , 2014, 2014 IEEE 26th International Conference on Tools with Artificial Intelligence.

[7]  Patrick Doherty,et al.  Incremental Dynamic Controllability in Cubic Worst-Case Time , 2014, 2014 21st International Symposium on Temporal Representation and Reasoning.

[8]  Paul Morris,et al.  Dynamic Controllability and Dispatchability Relationships , 2014, CPAIOR.

[9]  Patrick Doherty,et al.  EfficientIDC: A Faster Incremental Dynamic Controllability Algorithm , 2014, ICAPS.

[10]  Roman Barták,et al.  An Introduction to Constraint-Based Temporal Reasoning , 2014, An Introduction to Constraint-Based Temporal Reasoning.

[11]  Jian Wang,et al.  A resource enhanced HTN planning approach for emergency decision-making , 2012, Applied Intelligence.

[12]  Jörg Hoffmann,et al.  Resource-Constrained Planning: A Monte Carlo Random Walk Approach , 2012, ICAPS.

[13]  Roman Barták,et al.  Integrating Time and Resources into Planning , 2010, 2010 22nd IEEE International Conference on Tools with Artificial Intelligence.

[14]  Patrik Haslum,et al.  Deterministic planning in the fifth international planning competition: PDDL3 and experimental evaluation of the planners , 2009, Artif. Intell..

[15]  Paul Robertson,et al.  A Fast Incremental Algorithm for Maintaining Dispatchability of Partially Controllable Plans , 2007, ICAPS.

[16]  Paul Morris,et al.  A Structural Characterization of Temporal Dynamic Controllability , 2006, CP.

[17]  Antonio González Muñoz,et al.  SIADEX: An interactive knowledge-based planner for decision support in forest fire fighting , 2005, AI Commun..

[18]  Nicola Muscettola,et al.  Temporal Dynamic Controllability Revisited , 2005, AAAI.

[19]  S. Edelkamp,et al.  The Deterministic Part of IPC-4: An Overview , 2005, J. Artif. Intell. Res..

[20]  Patrick Doherty,et al.  TALplanner: A temporal logic based forward chaining planner , 2001, Annals of Mathematics and Artificial Intelligence.

[21]  Dana S. Nau,et al.  SHOP2: An HTN Planning System , 2003, J. Artif. Intell. Res..

[22]  Philippe Laborie,et al.  Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results , 2003, Artif. Intell..

[23]  Nicola Muscettola,et al.  Dynamic Control Of Plans With Temporal Uncertainty , 2001, IJCAI.

[24]  Federico Barber,et al.  Integrating planning and scheduling , 2001, Appl. Artif. Intell..

[25]  Patrik Haslum,et al.  Extending TALplanner with Concurrency and Resources , 2000, ECAI.

[26]  Nicola Muscettola,et al.  Execution of Temporal Plans with Uncertainty , 2000, AAAI/IAAI.

[27]  David E. Smith,et al.  Bridging the gap between planning and scheduling , 2000, The Knowledge Engineering Review.

[28]  Thierry Vidal,et al.  Handling contingency in temporal constraint networks: from consistency to controllabilities , 1999, J. Exp. Theor. Artif. Intell..

[29]  Amedeo Cesta,et al.  A Time and Resource Problem for Planning Architectures , 1997, ECP.

[30]  Malik Ghallab,et al.  Dealing with Uncertain Durations In Temporal Constraint Networks dedicated to Planning , 1996, ECAI.

[31]  A. El-Kholy,et al.  Temporal and Resource Reasoning in Planning: the parcPLAN approach , 1996, ECAI.

[32]  Malik Ghallab,et al.  Planning with Sharable Resource Constraints , 1995, IJCAI.

[33]  James A. Hendler,et al.  HTN Planning: Complexity and Expressivity , 1994, AAAI.

[34]  James A. Hendler,et al.  UMCP: A Sound and Complete Procedure for Hierarchical Task-network Planning , 1994, AIPS.

[35]  Austin Tate,et al.  O-Plan: The open Planning Architecture , 1991, Artif. Intell..

[36]  David E. Wilkins,et al.  Can AI planners solve practical problems? , 1990, Comput. Intell..