Simultaneous control of production, preventive and corrective maintenance rates of a failure-prone manufacturing system

This paper deals with the control of corrective and preventive maintenance rates in the production planning of a manufacturing system with machines subject to random failures and repairs. The introduction of preventive and corrective maintenance will increase the availability of the production system which guarantees the improvement of the system's productivity if the production planning is well done. The objective of this study is to minimize a discounted overall cost consisting of maintenance cost, inventory holding and backlog cost. The decision variables are the production, the machine preventive and repair rates which influence the inventory levels and the system capacity respectively. In the proposed model, the failure rate of a machine depends on its age; hence, the corrective and preventive maintenance policies are machine-age dependent. A computational algorithm, based on numerical methods, is used for solving the optimal control problem. Finally, a numerical example and a sensitive analysis are presented to illustrate the usefulness of the proposed approach. The structure of the optimal control policy is presented and extensions to more complex manufacturing systems are discussed.

[1]  Ali Gharbi,et al.  Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems , 2003 .

[2]  E. K. Boukas Hedging Point Policy Improvement , 1998 .

[3]  Ali Gharbi,et al.  Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system , 2003 .

[4]  Stanley B. Gershwin,et al.  Manufacturing Systems Engineering , 1993 .

[5]  A. Sharifnia,et al.  Production control of a manufacturing system with multiple machine states , 1988 .

[6]  Dale Black Optimizing comfort controls without central computers , 1976 .

[7]  R. Akella,et al.  Optimal control of production rate in a failure prone manufacturing system , 1985, 1985 24th IEEE Conference on Decision and Control.

[8]  Ali Gharbi,et al.  Production and preventive maintenance rates control for a manufacturing system: An experimental design approach , 2000 .

[9]  H. Kushner Numerical Methods for Stochastic Control Problems in Continuous Time , 2000 .

[10]  Jean-Pierre Kenné,et al.  Hierarchical control of production and maintenance rates in manufacturing systems , 2003 .

[11]  Qing Zhang,et al.  A numerical method in optimal production and setup scheduling of stochastic manufacturing systems , 1997 .

[12]  Ali Gharbi,et al.  Experimental design in production and maintenance control problem of a single machine, single product manufacturing system , 1999 .

[13]  Ali Gharbi,et al.  A simulation optimization approach in production planning of failure prone manufacturing systems , 2001, J. Intell. Manuf..

[14]  R. Rishel Control of systems with jump Markov disturbances , 1975 .

[15]  El-Kébir Boukas,et al.  Manufacturing flow control and preventing maintenance: a stochastic control approach , 1988 .