Existing buildings contribute greatly to global energy use and greenhouse gas emissions. In the UK, about 18% of carbon emissions are generated by non-domestic buildings; sustainable building refurbishment can play an important role in reducing carbon emissions. This paper looks at the performance of a recently refurbished 5-storey office building in London, in terms of energy consumption as well as occupants’ satisfaction.
Pre- and post-occupancy evaluation studies were conducted using online questionnaire surveys and energy consumption evaluation.
Results from pre-occupancy and post-occupancy evaluation studies showed that employees, in general, were more satisfied with their work environment at the refurbished building than with that of their previous office. Employees’ self-reported productivity improved after the move to Elms House. These surveys showed a positive relationship between employees’ satisfaction with their work environment and their self-reported productivity, well-being and enjoyment at work. The factor that contributed to increasing employee satisfaction the most was: better use of interior space. Although the refurbishment was a success in terms of reducing energy consumption per m2, the performance gap was almost 3 times greater than that estimated. Unregulated loads, problems with building control, ineffective use of space and occupants’ behaviour are argued to be reasons for this gap.
[1]
Paula Femenias,et al.
Potentials and challenges for sustainable retrofitting of non-domestic buildings: A UK perspective
,
2008
.
[2]
Le Thomas,et al.
Evaluating design strategies, performance and occupant satisfaction: a low carbon office refurbishment
,
2010
.
[3]
J. Vischer.
The effects of the physical environment on job performance : Towards a theoretical model of workspace stress
,
2007
.
[4]
Jacqueline Vischer,et al.
Space Meets Status: Designing Workplace Performance
,
2005
.
[5]
Adrian Leaman,et al.
Assessing building performance in use 4: the Probe occupant surveys and their implications
,
2001
.
[6]
Adrian Leaman,et al.
Productivity in buildings: the ‘killer’ variables
,
1999
.