Bidding Strategy to Support Decision-Making Based on Comprehensive Information in Construction Projects
暂无分享,去创建一个
Zhaohan Sheng | Changzhi Wu | Feng Xu | Ru Liang | Zhaohan Sheng | Changzhi Wu | R. Liang | Feng Xu
[1] Makarand Hastak,et al. Quantitative Analysis of Bidding Strategies: A Hybrid Agent Based-System Dynamics Approach , 2014 .
[2] Sergios Lambropoulos. The use of time and cost utility for construction contract award under European Union Legislation , 2007 .
[3] Mohammad S. El-Mashaleh,et al. Empirical Framework for Making the Bid/No-Bid Decision , 2013 .
[4] Rita Awwad,et al. Evolutionary Simulation of Contractors’ Learning and Behavior under Two Bid-Tendering Approaches , 2016 .
[5] Adiel Teixeira de Almeida,et al. Multicriteria decision model for outsourcing contracts selection based on utility function and ELECTRE method , 2007, Comput. Oper. Res..
[6] Min-Yuan Cheng,et al. Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry , 2010, Expert Syst. Appl..
[7] Xiangyu Wang,et al. A genetic algorithm for unconstrained multi-objective optimization , 2015, Swarm Evol. Comput..
[8] Qiping Shen,et al. Identification of Key Contractor Characteristic Factors That Affect Project Success under Different Project Delivery Systems: Empirical Analysis Based on a Group of Data from China , 2016 .
[9] Jui-Sheng Chou,et al. Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation , 2013 .
[10] Y. Ilker Topcu,et al. A decision model proposal for construction contractor selection in Turkey , 2004 .
[11] Daniel Mora-Meliá,et al. Modeling bidding competitiveness and position performance in multi-attribute construction auctions , 2015 .
[12] Sidhartha S. Padhi,et al. Centralized bid evaluation for awarding of construction projects – A case of India government , 2010 .
[13] Heng Li,et al. Practical Framework for Measuring Performance of International Construction Firms , 2013 .
[14] Aria Nosratinia,et al. Grouping and partner selection in cooperative wireless networks , 2007, IEEE Journal on Selected Areas in Communications.
[15] D. K. H. Chua,et al. Key Factors in Bid Reasoning Model , 2000 .
[16] Prasad A. Naik,et al. BidAnalyzer: A Method for Estimation and Selection of Dynamic Bidding Models , 2008, Mark. Sci..
[17] S. Asgari,et al. Impact of considering need for work and risk on performance of construction contractors: An agent-based approach , 2016 .
[18] Jui-Sheng Chou,et al. Generalized linear model-based expert system for estimating the cost of transportation projects , 2009, Expert Syst. Appl..
[19] F. Glover,et al. Analyzing and Modeling the Maximum Diversity Problem by Zero‐One Programming* , 1993 .
[20] K. Lai,et al. A method used for evaluating bids in the chinese construction industry , 2004 .
[21] Luciana Hazin Alencar,et al. Multicriteria decision group model for the selection of suppliers , 2008 .
[22] M. Cheng,et al. Bidding Decision Making for Construction Company using a Multi-criteria Prospect Model , 2011 .
[23] Keith R. Molenaar,et al. Synthesis of Performance Measures for Highway Cost Estimating , 2014 .
[24] Francisco Herrera,et al. Some induced ordered weighted averaging operators and their use for solving group decision-making problems based on fuzzy preference relations , 2007, Eur. J. Oper. Res..
[25] Michael Riley,et al. A multi‐criteria approach to contractor selection , 2002 .
[26] Adiel Teixeira de Almeida Filho,et al. Multi-criteria decision model for selecting repair contracts by applying utility theory and variable interdependent parameters , 2010 .
[27] Hubert Missbauer,et al. Bid calculation for construction projects: Regulations and incentive effects of unit price contracts , 2006, Eur. J. Oper. Res..
[28] Chris Fortune,et al. BID/ NO-BID DECISION MODELLING FOR CONSTRUCTION PROJECTS , 2006 .
[29] Hyoun-Seung Jang,et al. An MDB business competency assessment of Korean construction companies , 2014 .
[30] Irem Dikmen,et al. A case-based decision support tool for bid mark-up estimation of international construction projects , 2007 .
[31] Heng Li,et al. Contractor selection using the analytic network process , 2004 .
[32] David Lowe,et al. A logistic regression approach to modelling the contractor's decision to bid , 2004 .
[33] Dirk Schiereck,et al. Long-run M&A success of strategic bidders in the construction industry , 2017 .
[34] Sangyoon Chin,et al. Comparable Performance Measurement System for Construction Companies , 2007 .
[35] Brenda McCabe,et al. Introduction Construction , 2022 .
[36] Changzhi Wu,et al. A Hybrid Method Combining Genetic Algorithm and Hooke-Jeeves Method for Constrained Global Optimization , 2014 .
[37] Bin Xue,et al. A Group Decision-Making Aggregation Model for Contractor Selection in Large Scale Construction Projects Based on Two-Stage Partial Least Squares (PLS) Path Modeling , 2015 .
[38] Mohammed Wanous,et al. To bid or not to bid: a parametric solution , 2000 .
[39] G. S. Sekhon,et al. Optimization of grinding process parameters using enumeration method , 2001 .
[40] Enrique Herrera-Viedma,et al. A New Consensus Model for Group Decision Making Problems With Non-Homogeneous Experts , 2014, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[41] Farzad Khosrowshahi,et al. Neural network model for contractors’ prequalification for local authority projects , 1999 .
[42] Ezgi Aktar Demirtaş,et al. An integrated multiobjective decision making process for supplier selection and order allocation , 2008 .