Commissioning of the Swiss Light Source
暂无分享,去创建一个
M. Pedrozzi | M. Munoz | A. Streun | V. Schlott | M. Dehler | L. Rivkin | W. Joho | T. Schilcher | P. Marchand | A. Wrulich | C. Gough | L. Schulz | T. Korhonen | M. Boge | A. Ludeke
[1] M. Boge,et al. Commissioning of the SLS using CORBA based beam dynamics applications , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[2] Robert E. Ruland. Dynamic Alignment at SLS , 2003 .
[3] R. Ursic,et al. Commissioning of the SLS digital BPM system , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[4] SLS linac diagnostics—commissioning results , 2001 .
[5] C. Gough,et al. Septum and kicker systems for the SLS , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[6] A. Luedeke. System Integration of High Level Applications during the Commissioning of the Swiss Light Source , 2001, ArXiv.
[7] R. Ursic,et al. Fast closed orbit control in the SLS storage ring , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).
[8] R. Ursic,et al. Exploitation of the integrated digital processing and analysis of the ELETTRA/SLS Transverse Multi-Bunch Feedback System , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).