Optimized Group Replacement Scheduling for Water Pipeline Network

AbstractReplacement of deteriorated water pipes is a capital-intensive activity for utility companies. Replacement planning aims to minimize total costs while maintaining a satisfactory level of service and is usually conducted for individual pipes. Scheduling replacement in groups is seen to be a better method and has the potential to provide benefits such as the reduction of maintenance costs and service interruptions. However, developing group replacement schedules is a complex task and often beyond the ability of a human expert, especially when multiple or conflicting objectives need to be catered for, such as minimization of total costs and service interruptions. This paper describes the development of a novel replacement decision optimization model for group scheduling (RDOM-GS), which enables multiple group-scheduling criteria by integrating new cost functions, a service interruption model, and optimization algorithms into a unified procedure. An industry case study demonstrates that RDOM-GS can im...

[1]  Graeme C. Dandy,et al.  Multi-Objective Trade-Offs between Cost and Reliability in the Replacement of Water Mains , 2006 .

[2]  Luigi Berardi,et al.  Prioritizing pipe replacement: from multiobjective genetic algorithms to operational decision support. , 2009 .

[3]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[4]  Stefano Alvisi,et al.  Multiobjective Optimization of Rehabilitation and Leakage Detection Scheduling in Water Distribution Systems , 2009 .

[5]  Lin Ma,et al.  A grouping model for distributed pipeline assets maintenance decision , 2011, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.

[6]  E. Roshani,et al.  Event-Based Approach to Optimize the Timing of Water Main Rehabilitation with Asset Management Strategies , 2014 .

[7]  Enrico Creaco,et al.  Multiobjective Optimization of Pipe Replacements and Control Valve Installations for Leakage Attenuation in Water Distribution Networks , 2015 .

[8]  Barry J. Adams,et al.  Water Distribution Network Renewal Planning , 2001 .

[9]  Balvant Rajani,et al.  Comprehensive review of structural deterioration of water mains: physically based models , 2001 .

[10]  Lin Ma,et al.  Reliability prediction of long-lived linear assets with incomplete failure data , 2011, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.

[11]  Lin Ma,et al.  A practical approach for reliability prediction of pipeline systems , 2009, Eur. J. Oper. Res..

[12]  Yehuda Kleiner,et al.  Scheduling Renewal of Water Pipes While Considering Adjacency of Infrastructure Works and Economies of Scale , 2010 .

[13]  E. Roshani,et al.  Water Distribution System Rehabilitation under Climate Change Mitigation Scenarios in Canada , 2015 .

[14]  Miraç Eryiğit,et al.  Cost optimization of water distribution networks by using artificial immune systems , 2015 .

[15]  Barry J. Adams,et al.  LONG-TERM PLANNING METHODOLOGY FOR WATER DISTRIBUTION SYSTEM REHABILITATION , 1998 .

[16]  Dragan Savic,et al.  Rehabilitation strategies for water distribution networks: a literature review with a UK perspective , 2000 .

[17]  Yehuda Kleiner SIMULTANEOUS OPTIMIZATION OF PIPE AND PAVEMENT RENEWAL SCHEDULING , 2013 .

[18]  Balvant Rajani,et al.  Planning renewal of water mains while considering deterioration, economies of scale and adjacent infrastructure , 2010 .

[19]  Mahmoud R. Halfawy,et al.  Integrated Decision Support System for Optimal Renewal Planning of Sewer Networks , 2008 .