Performance Evaluation of Longitudinal Ultrahigh-Performance Concrete Closure Pour Connection for Use in Modular Bridge Construction: Pairwise Comparison of Capacity and Ductility at Failure Limit State
暂无分享,去创建一个
[1] Brent M. Phares,et al. Impact Of Concrete Deck Removal On Horizontal Shear Capacity Of Shear Connections , 2016 .
[2] Atorod Azizinamini,et al. Experimental Investigation of Longitudinal Closure Pour Detail for Prefabricated Slabs Used in Modular Construction , 2014 .
[3] Benjamin A Graybeal. BEHAVIOR OF ULTRA-HIGH PERFORMANCE CONCRETE CONNECTIONS BETWEEN PRECAST BRIDGE DECK ELEMENTS , 2010 .
[4] Yaohua Deng,et al. Efficient Prestressed Concrete-Steel Composite Girder for Medium-Span Bridges , 2013 .
[5] Christopher Y. Tuan,et al. Numerical analysis of concrete-filled circular steel tubes , 2013 .
[6] Zhongguo John Ma,et al. Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Concept Development , 2010 .
[7] Sang-Hyeok Gang,et al. Report Card for America's Infrastructure , 2012 .
[8] Douglas Robert Hartwell. Laboratory testing of Ultra High Performance Concrete deck joints for use in accelerated bridge construction , 2011 .
[9] Ekkehard Fehling,et al. "Ultra-High-Performance Concrete: Research, Development and Application in Europe" , 2005, SP-228: 7th Intl Symposium on the Utilization of High-Strength/High-Performance Concrete.
[10] Benjamin A. Graybeal,et al. Ultra-High Performance Concrete: A State-of-the-Art Report for the Bridge Community , 2013 .