Enhanced D^{*}-Driven Policy
暂无分享,去创建一个
[1] Haruhiko Suwa,et al. Capability of cumulative delay based reactive scheduling for job shops with machine breakdowns , 2007, Comput. Ind. Eng..
[2] Robert J. Wittrock,et al. An Adaptable Scheduling Algorithm for Flexible Flow Lines , 1988, Oper. Res..
[3] Karin Krüger,et al. Heuristics for generalized shop scheduling problems based on decomposition , 1998 .
[4] Jeffrey W. Herrmann,et al. Predicting the performance of rescheduling strategies for parallel machine systems , 2000 .
[5] Kathryn E. Stecke,et al. Production planning for flexible flow systems with limited machine flexibility , 1998 .
[6] Reha Uzsoy,et al. Decomposition Methods for Complex Factory Scheduling Problems , 1996 .
[7] Heinrich Kuhn,et al. A taxonomy of flexible flow line scheduling procedures , 2007, Eur. J. Oper. Res..
[8] Chelliah Sriskandarajah,et al. Scheduling algorithms for flexible flowshops: Worst and average case performance , 1988 .
[9] Robert J. Wittrock,et al. Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..
[10] Derek L. Nazareth,et al. Intelligent decision support for flexible manufacturing: Design and implementation of a knowledge-based simulator , 1996 .
[11] J. Hunsucker,et al. BRANCH AND BOUND ALGORITHM FOR THE FLOW SHOP WITH MULTIPLE PROCESSORS , 1991 .