Assembling and Supporting the Joint Strike Fighter in the UK
暂无分享,去创建一个
Jerry M. Sollinger | Mark V. Arena | Hans Pung | Obaid Younossi | Cynthia R. Cook | John C. Graser | Hans Pung
[1] Cynthia R. Cook,et al. Military Airframe Acquisition Costs: The Effects of Lean Manufacturing , 2001 .
[2] Jerry M. Sollinger,et al. Final Assembly and Checkout Alternatives for the Joint Strike Fighter , 2002 .
[3] John Birkler,et al. Reconstituting a production capability : past experience, restart criteria, and suggested policies , 1995 .
[4] Serkan Virlan. Issues and Concerns in International Co-Development Efforts , 2002 .
[5] THE PARLIAMENTARY SESSION , 1905, British medical journal.
[6] J R Nelson. Life-Cycle Analysis of Aircraft Turbine Engines , 1977 .
[7] Paul K. Davis,et al. New Challenges, New Tools for Defense Decisionmaking , 2003 .
[8] Milton Kamins. Quick Fix: Reducing Aircraft Inspection Redundancy between Base and Depot, , 1973 .
[9] Kenneth E Marks,et al. Estimating aircraft depot maintenance costs , 1981 .
[10] Christopher Bolkcom,et al. Navy-Marine Corps Tactical Air Integration Plan: Background and Issues for Congress , 2003 .
[11] Obaid Younossi,et al. The Effects of Advanced Materials on Airframe Operating and Support Costs , 2003 .
[12] Michael Hesse,et al. Multinational Coproduction of Military Aerospace Systems. , 1981 .
[13] John Birkler,et al. Cost and Schedule Implications of Multinational Coproduction , 1985 .
[14] H. Asher. Cost-quantity relationships in the airframe industry , 1956 .