Principles of modern electricity pricing
暂无分享,去创建一个
[1] Nancy D. Ruggles. Recent Developments in the Theory of Marginal Cost Pricing , 1949 .
[2] Mohan Munasinghe,et al. A New Approach to Power System Planning , 1980, IEEE Transactions on Power Apparatus and Systems.
[3] J. Warford,et al. Shadow pricing and power tariff policy , 1978 .
[4] J. Robert Malko,et al. Implementing Time-Of-Day Pricing of Electricity: Some Current Challenges and Activities , 1980 .
[5] James E. Suelflow. Public Utility Accounting: Theory and Application , 1973 .
[6] J. Wenders. Peak Load Pricing in the Electric Utility Industry , 1976 .
[7] E. Quah,et al. Cost-Benefit Analysis , 1972 .
[8] Ralph Turvey,et al. Optimal Pricing and Investment in Electricity Supply , 1968 .
[9] A. Miedema,et al. Time-of-use electricity price effects: Arizona , 1978 .
[10] M. Munasinghe,et al. An Integrated Framework for Energy Pricing in Developing Countries , 1980 .
[11] P. Steiner. Peak Loads and Efficient Pricing , 1957 .
[12] M. Munasinghe. Costs incurred by residential electricity consumers due to power failures , 1980 .
[13] A. Francfort,et al. Lifeline and incremental cost residential electric rates , 1977 .
[14] Paul R. Kleindorfer,et al. Public Utility Economics , 1981 .
[15] R. V. deGrasse. Electric storage heating after two years , 1977 .
[16] Lyn Squire,et al. Economic Analysis of Projects , 1976 .
[17] B. HASTINGS,et al. Ten Years of Operating Experience with a Remote Controlled Water Heater Load Management System at Detroit Edison , 1980, IEEE Transactions on Power Apparatus and Systems.
[18] D. W. Caves,et al. Residential Substitution of Off-peak for Peak Electricity Usage under Time-of-Use Pricing , 1980 .
[19] Wallace F. Lovejoy,et al. Public Utility Economics , 1963 .
[20] John C. Panzar,et al. A Neoclassical Approach to Peak Load Pricing , 1976 .
[21] Nancy D. Ruggles. The Welfare Basis of the Marginal Cost Pricing Principle , 1949 .
[22] R. Sherman,et al. Second Best Pricing with Stochastic Demand , 1978 .
[23] S. Reynolds,et al. Time-of-use Rates for Very Large Customers on the Pacific Gas and Electric Company System , 1980, IEEE Transactions on Power Apparatus and Systems.
[24] H. Hotelling. THE GENERAL WELFARE IN RELATION TO PROBLEMS OF TAXATION AND OF RAILWAY AND UTILITY RATES. IN: RAILWAYS , 1938 .
[25] M. Munasinghe,et al. Economic criteria for optimizing power system reliability levels , 1979 .
[26] David L. Bradford,et al. Optimal Departures from Marginal Cost Pricing , 1970 .