Assessment of mining induced stress development over coal pillars during depillaring

Abstract Earlier, an analysis of in situ observations at different sites of Indian coalfields was made to visualize the development of mining induced stress over the coal pillars facing goaf line. An empirical relationship was also attempted to estimate the range of influence and the value of ultimate induced stress (vertical) over the coal pillars. However, the attempt was based on field monitoring data of only five depillaring faces with varying geo-mining conditions. Considering a need of the Indian coal mining industry, further field monitoring is done at 16 more depillaring faces with depth cover (average) range variation from 44 to 244 m. The geo-mechanical properties of overlying roof strata of each site were also determined to assess their caving characteristics in terms CMRI (now, CIMFR) caveability index, which nearly varied from 1000 to 10,000 for the studied sites. Presenting a brief review of different studies conducted for mining induced stress development, this paper discusses outcomes of the in situ studies of mining induced stress development during depillaring under varying geo-mining conditions. Considering the results of this study, earlier developed empirical relationship was, accordingly, modified for estimation of the range of influence and the value of ultimate mining induced stress (vertical) over the coal pillars.

[1]  J. P. Harrison,et al.  Numerical analysis of progressive fracture and associated behaviour of mine pillars by use of a local degradation model , 2002 .

[2]  P. R. Sheorey Pillar Strength considering in situ Stresses , 2000 .

[3]  P. R. Sheorey,et al.  Numerical estimation of pillar strength in coal mines , 2001 .

[4]  Ashok Jaiswal,et al.  Numerical modeling study of asymmetry in the induced stresses over coal mine pillars with advancement of the goaf line , 2004 .

[5]  Xuefu Xian,et al.  Dynamic nature of coal permeability ahead of a longwall face , 1999 .

[6]  H. Wagner Pillar design in coal mines , 1980 .

[7]  Brett Poulsen,et al.  Coal pillar load calculation by pressure arch theory and near field extraction ratio , 2010 .

[8]  J. F. Abel,et al.  Soft rock pillars , 1988 .

[9]  P. R. Sheorey,et al.  Ground subsidence observations and a modified influence function method for complete subsidence prediction , 2000 .

[10]  P J Lunder,et al.  Determination of the strength of hard-rock mine pillars , 1997 .

[11]  M. Salamon,et al.  ELASTIC ANALYSIS OF DISPLACEMENTS AND STRESSES INDUCED BY THE MINING OF SEAM OR REEF DEPOSITS , 1963 .

[12]  A. K. Singh,et al.  Upshot of strata movement during underground mining of a thick coal seam below hilly terrain , 2008 .

[13]  T. N. Singh,et al.  Coal pillar loading in shallow mining conditions , 1996 .

[14]  Dennis R. Dolinar,et al.  Observations And Evaluation of Floor Benching Effects On Pillar Stability In U.S. Limestone Mines , 2007 .

[15]  John A. Hudson,et al.  Comprehensive rock engineering , 1993 .

[16]  A. K. Singh,et al.  Underpinning-based simultaneous extraction of contiguous sections of a thick coal seam under weak and laminated parting , 2008 .

[17]  T. N. Singh,et al.  Stress Distribution During Extraction of Pillars in a Thick Coal Seam , 2004 .

[18]  Rajendra Singh,et al.  Stability of Pillars during underground extraction of thick coal seam in single lift – case studies , 2007 .

[19]  K. P. Mukherjee,et al.  Application of the yield pillar technique for successful depillaring under stiff strata , 1995 .

[20]  Hua Guo,et al.  Displacement, stress and seismicity in roadway roofs during mining-induced failure , 2008 .

[21]  A. K. Singh,et al.  Mining Induced Stress Estimation For Pillar Extraction At Shallow Cover , 2003 .

[22]  Jhareswar Maiti,et al.  An observational approach for assessment of dynamic loading during underground coal pillar extraction , 2011 .

[23]  Santanu Majumder,et al.  The vertical stress distribution in a coal side of a roadway—an elastic foundation approach , 1991 .

[24]  K. A. Heasley The Forgotten Denominator, Pillar Loading , 2000 .

[25]  H. Yavuz,et al.  An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines , 2004 .

[26]  P. R. Sheorey,et al.  24 – Design of Coal Pillar Arrays and Chain Pillars , 1993 .

[27]  P. R. Sheorey A theory for In Situ stresses in isotropic and transverseley isotropic rock , 1994 .

[28]  Rajendra Singh Staggered development of a thick coal seam for full height working in a single lift by the blasting gallery method , 2004 .

[29]  P. R. Sheorey,et al.  Numerical simulation of caved goaf behaviour in longwall workings , 1994 .

[30]  P. R. Sheorey Empirical Rock Failure Criteria , 1997 .

[31]  T. N. Singh,et al.  Cable-bolting-based semi-mechanised depillaring of a thick coal seam , 2001 .