Assessment of mining induced stress development over coal pillars during depillaring
暂无分享,去创建一个
Rajendra Singh | Prantik Mandal | Rakesh Kumar | Jhareswar Maiti | Atampreet Singh | Rajendra Singh | Rakesh Kumar | J. Maiti | P. Mandal | Aastha Singh
[1] J. P. Harrison,et al. Numerical analysis of progressive fracture and associated behaviour of mine pillars by use of a local degradation model , 2002 .
[2] P. R. Sheorey. Pillar Strength considering in situ Stresses , 2000 .
[3] P. R. Sheorey,et al. Numerical estimation of pillar strength in coal mines , 2001 .
[4] Ashok Jaiswal,et al. Numerical modeling study of asymmetry in the induced stresses over coal mine pillars with advancement of the goaf line , 2004 .
[5] Xuefu Xian,et al. Dynamic nature of coal permeability ahead of a longwall face , 1999 .
[6] H. Wagner. Pillar design in coal mines , 1980 .
[7] Brett Poulsen,et al. Coal pillar load calculation by pressure arch theory and near field extraction ratio , 2010 .
[8] J. F. Abel,et al. Soft rock pillars , 1988 .
[9] P. R. Sheorey,et al. Ground subsidence observations and a modified influence function method for complete subsidence prediction , 2000 .
[10] P J Lunder,et al. Determination of the strength of hard-rock mine pillars , 1997 .
[11] M. Salamon,et al. ELASTIC ANALYSIS OF DISPLACEMENTS AND STRESSES INDUCED BY THE MINING OF SEAM OR REEF DEPOSITS , 1963 .
[12] A. K. Singh,et al. Upshot of strata movement during underground mining of a thick coal seam below hilly terrain , 2008 .
[13] T. N. Singh,et al. Coal pillar loading in shallow mining conditions , 1996 .
[14] Dennis R. Dolinar,et al. Observations And Evaluation of Floor Benching Effects On Pillar Stability In U.S. Limestone Mines , 2007 .
[15] John A. Hudson,et al. Comprehensive rock engineering , 1993 .
[16] A. K. Singh,et al. Underpinning-based simultaneous extraction of contiguous sections of a thick coal seam under weak and laminated parting , 2008 .
[17] T. N. Singh,et al. Stress Distribution During Extraction of Pillars in a Thick Coal Seam , 2004 .
[18] Rajendra Singh,et al. Stability of Pillars during underground extraction of thick coal seam in single lift – case studies , 2007 .
[19] K. P. Mukherjee,et al. Application of the yield pillar technique for successful depillaring under stiff strata , 1995 .
[20] Hua Guo,et al. Displacement, stress and seismicity in roadway roofs during mining-induced failure , 2008 .
[21] A. K. Singh,et al. Mining Induced Stress Estimation For Pillar Extraction At Shallow Cover , 2003 .
[22] Jhareswar Maiti,et al. An observational approach for assessment of dynamic loading during underground coal pillar extraction , 2011 .
[23] Santanu Majumder,et al. The vertical stress distribution in a coal side of a roadway—an elastic foundation approach , 1991 .
[24] K. A. Heasley. The Forgotten Denominator, Pillar Loading , 2000 .
[25] H. Yavuz,et al. An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines , 2004 .
[26] P. R. Sheorey,et al. 24 – Design of Coal Pillar Arrays and Chain Pillars , 1993 .
[27] P. R. Sheorey. A theory for In Situ stresses in isotropic and transverseley isotropic rock , 1994 .
[28] Rajendra Singh. Staggered development of a thick coal seam for full height working in a single lift by the blasting gallery method , 2004 .
[29] P. R. Sheorey,et al. Numerical simulation of caved goaf behaviour in longwall workings , 1994 .
[30] P. R. Sheorey. Empirical Rock Failure Criteria , 1997 .
[31] T. N. Singh,et al. Cable-bolting-based semi-mechanised depillaring of a thick coal seam , 2001 .