Last time buy decisions for products sold under warranty

Manufacturers supplying products under warranty need a strategy to deal with failures during the warranty period: repair the product or replace it by a new one, depending on e.g. age and/or usage of the failed product. An (implicit) assumption in virtually all models is that new products to replace the failed ones are immediately available at given replacement costs. Because of the short life cycles of many products, manufacturing may be discontinued before the end of the warranty period. At that point in time, the supplier has to decide how many products to put on the shelf to replace failed products under warranty that will be returned from the field (the last time buy decision). This is a trade-off between product availability for replacement and costs of product obsolescence. In this paper, we consider the joint optimization of repair-replacement decisions and the last time buy quantity for products sold under warranty. We develop approximations to estimate the total relevant costs and service levels for this problem, and show that we can easily find near-optimal last time buy quantities using a numerical search. Comparison to discrete event simulation results shows an excellent performance of our methods.

[1]  Ben Vermeulen,et al.  Co-evolution of demand and supply under competition , 2009 .

[2]  Kmr Kristel Hoen,et al.  Effect of carbon emission regulations on transport mode selection in supply chains , 2010 .

[3]  Geert-Jan van Houtum,et al.  Separate tools or tool kits:an exploratory study of engineers' preferences , 2010 .

[4]  Gülay Samatli-Paç,et al.  The role of repair strategy in warranty cost minimization: An investigation via quasi-renewal processes , 2009, Eur. J. Oper. Res..

[5]  Rji Rob Basten,et al.  An iterative method for the simultaneous optimization of repair decisions and spare parts stocks , 2009 .

[6]  Paul Grefen,et al.  An efficient method to construct minimal protocol adaptors , 2009 .

[7]  Herbert Kopfer,et al.  Distributed Decision Making in Combined Vehicle Routing and Break Scheduling , 2009, LDIC.

[8]  Gudrun P. Kiesmüller,et al.  Analysis of a two-echelon inventory system with two supply modes , 2013, Eur. J. Oper. Res..

[9]  Egon Lüftenegger,et al.  A Framework for Business Innovation Directions , 2011 .

[10]  Elias W. Hans,et al.  Vehicle Routing with Traffic Congestion and Drivers' Driving and Working Rules , 2010 .

[11]  D. N. P. Murthy,et al.  Warranty servicing with imperfect repair , 2008 .

[12]  Rommert Dekker,et al.  End-of-Life Inventory Decisions for Consumer Electronics Service Parts , 2010 .

[13]  Erwin W. Hans,et al.  Vehicle routing under time-dependent travel times: The impact of congestion avoidance , 2012, Comput. Oper. Res..

[14]  Ben Vermeulen,et al.  Toward meso-level product-market network indices for strategic product selection and (re)design guidelines over the product life-cycle , 2010 .

[15]  Rji Rob Basten,et al.  Practical extensions to the level of repair analysis , 2010 .

[16]  van Gjjan Geert-Jan Houtum,et al.  Inventory planning for spare parts networks with delivery time requirements , 2009 .

[17]  Matthieu van der Heijden,et al.  Joint optimization of level of repair analysis and spare parts stocks , 2012, Eur. J. Oper. Res..

[18]  Matthieu van der Heijden,et al.  An approximate approach for the joint problem of level of repair analysis and spare parts stocking , 2015, Ann. Oper. Res..

[19]  Mm Michiel Jansen,et al.  The effect of workload constraints in mathematical programming models for production planning , 2010 .

[20]  van der Mc Matthieu Heijden,et al.  The selective use of emergency shipments for service-contract differentiation , 2011 .

[21]  Mark S. Daskin,et al.  The effect of lifetime buys on warranty repair operations , 2010, J. Oper. Res. Soc..

[22]  W. Blischke,et al.  Warranty Management and Product Manufacture , 2005 .

[23]  Rainer Kleber,et al.  A Heuristic Approach for Integrating Product Recovery into Post PLC Spare Parts Procurement , 2009 .

[24]  Johan Marklund,et al.  Using pipeline information in a multi-echelon spare parts inventory system , 2010 .

[25]  O. Alp,et al.  Tales of a so(u)rcerer : optimal sourcing decisions under alternative capacitated suppliers and general cost structures , 2010 .

[26]  Graham K. Rand,et al.  Inventory Management and Production Planning and Scheduling (Third Edition) , 2001, J. Oper. Res. Soc..

[27]  Ruud H. Teunter,et al.  The 'final orderrs problem , 1998, Eur. J. Oper. Res..

[28]  N. Litvak,et al.  A Survey of Health Care Models that Encompass Multiple Departments , 2009 .

[29]  Krishnamurthy Vidyasankar,et al.  Supporting process control in business collaborations , 2009 .

[30]  Egon Lüftenegger,et al.  The state of the art of innovation-driven business models in the financial services industry , 2010 .

[31]  D. N. P. Murthy,et al.  Two new servicing strategies for products sold with one-dimensional warranties , 2010 .

[32]  Herbert Kopfer,et al.  Analyzing combined vehicle routing and break scheduling from a distributed decision making perspective , 2009 .

[33]  BERMAWI P. ISKANDAR,et al.  Two New Servicing Strategies for Products sold with warranty , 2012, Asia Pac. J. Oper. Res..

[34]  Martin Grunow,et al.  Capacity flexibility allocation in an outsourced supply chain with reservation , 2011 .

[35]  Leonard Fortuin,et al.  The All‐Time Requirement of Spare Parts for Service After Sales—Theoretical Analysis and Practical Results , 1980 .

[36]  D. N. Prabhakar Murthy,et al.  A new repair-replace strategy for items sold with a two-dimensional warranty , 2005, Comput. Oper. Res..

[37]  Nat Jack,et al.  Optimal repair-replace strategies for a warranted product , 2000 .

[38]  Stefan Minner,et al.  Inventory redistribution for fashion products under demand parameter update , 2009 .

[39]  Kmr Kristel Hoen,et al.  Effect of carbon emission regulations on transport mode selection under stochastic demand , 2014 .

[40]  Murat Firat,et al.  Stability in multi-skill workforce scheduling , 2010 .

[41]  Xiaoyue Jiang,et al.  On a conjecture of optimal repair-replacement strategies for warranted products , 2006, Math. Comput. Model..

[42]  Richard J. Boucherie,et al.  Efficiency evaluation for pooling resources in health care , 2009, OR Spectr..

[43]  A. J. M. M. Weijters,et al.  Flexible Heuristics Miner (FHM) , 2011, 2011 IEEE Symposium on Computational Intelligence and Data Mining (CIDM).

[44]  Paul Grefen,et al.  Minimal protocol adaptors for interacting services , 2010 .

[45]  Rommert Dekker,et al.  End-of-life inventory problem with phaseout returns , 2011 .

[46]  Paul Grefen,et al.  Design of complex architectures using a three dimension approach : the crosswork case , 2010 .

[47]  Warren B. Powell,et al.  Hierarchical Knowledge Gradient for Sequential Sampling , 2011, J. Mach. Learn. Res..

[48]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[49]  J. Fransoo,et al.  Identification of employment concentration and specialization areas : theory and application , 2010 .

[50]  Karl Inderfurth,et al.  Decision support for spare parts acquisition in post product life cycle , 2008, Central Eur. J. Oper. Res..

[51]  Jc Jan Fransoo,et al.  Spatial concentration and location dynamics in logistics:the case of a Dutch province , 2013 .

[52]  Ruud H. Teunter,et al.  Inventory control of service parts in the final phase , 2002, Eur. J. Oper. Res..

[53]  B. Madhu Rao,et al.  A decision support model for warranty servicing of repairable items , 2011, Comput. Oper. Res..

[54]  D. N. Prabhakar Murthy,et al.  A repair-replace strategy based on usage rate for items sold with a two-dimensional warranty , 2009, Reliab. Eng. Syst. Saf..

[55]  Bob Walrave,et al.  Preventing or escaping the suppression mechanism: intervention conditions , 2010 .

[56]  Herbert Kopfer,et al.  Dynamic programming algorithm for the vehicle routing problem with time windows and EC social legislation , 2009 .

[57]  Jc Jan Fransoo,et al.  Ocean Container Transport: An Underestimated and Critical Link in Global Supply Chain Performance , 2010 .

[58]  Jan C. Fransoo,et al.  Identification of Employment Concentration Areas , 2014 .

[59]  D. N. Prabhakar Murthy,et al.  Product warranty logistics: Issues and challenges , 2004, Eur. J. Oper. Res..

[60]  Jr. John R. Moore Forecasting and Scheduling for Past-Model Replacement Parts , 1971 .

[61]  Bob Huisman,et al.  Maintenance spare parts planning and control: a framework for control and agenda for future research , 2014 .

[62]  T. Tan,et al.  The final order problem for repairable spare parts under condemnation , 2009, J. Oper. Res. Soc..

[63]  Alan Scheller-Wolf,et al.  Comparing Markov chains : combining aggregation and precedence relations applied to sets of states , 2009 .

[64]  Osman Alp,et al.  Inventory control with partial batch ordering , 2009 .

[65]  J. M. J. Schutten,et al.  Restricted dynamic programming: A flexible framework for solving realistic VRPs , 2012, Comput. Oper. Res..

[66]  Richard J. Boucherie,et al.  An exact approach for relating recovering surgical patient workload to the master surgical schedule , 2009, J. Oper. Res. Soc..

[67]  H. R. Krikke,et al.  Last Time Buy and Control Policies with Phase-Out Returns: A Case Study in Plant Control Systems , 2009 .

[68]  Jmj Marco Schutten,et al.  Inventory reduction in spare part networks by selective throughput time reduction , 2013 .

[69]  Xiaoyue Jiang,et al.  A finite horizon model for repairable systems with repair restrictions , 2008, J. Oper. Res. Soc..