Mining truck scheduling with stochastic maintenance cost
暂无分享,去创建一个
[1] Erkan Topal,et al. A new algorithm for stope boundary optimization , 2010 .
[2] Erkan Topal,et al. Implementing a Production Schedule at LKAB's Kiruna Mine , 2004, Interfaces.
[3] Salih Ramazan,et al. The new Fundamental Tree Algorithm for production scheduling of open pit mines , 2007, Eur. J. Oper. Res..
[4] Horacio J. Marquez,et al. A stochastic optimization approach to mine truck allocation , 2005 .
[5] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[6] C. Musingwini,et al. Modelling open pit shovel-truck systems using the Machine Repair Model , 2007 .
[7] Erkan Topal,et al. Flexible open-pit mine design under uncertainty , 2011 .
[8] Erkan Topal,et al. A new MIP model for mine equipment scheduling by minimizing maintenance cost , 2010, Eur. J. Oper. Res..
[9] Erkan Topal,et al. Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling , 2008 .
[10] YingZhang,et al. Optimization model of truck flow at open-pit mines and standards for feasibility test , 2004 .
[11] C. Alford,et al. Optimisation in underground mine design , 1996 .
[12] F. R. Olivieri. Supervisory control systems and the intelligent mine : a new tool for productivity improvement in surface mining , 1996 .
[13] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.
[14] Mark Gershon. Heuristic approaches for mine planning and production scheduling , 1987 .
[15] Michel Gamache,et al. Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines , 2001 .
[16] Andreas T. Ernst,et al. Staff scheduling and rostering: A review of applications, methods and models , 2004, Eur. J. Oper. Res..
[17] Salih Ramazan,et al. Production scheduling with uncertain supply: a new solution to the open pit mining problem , 2013 .
[18] Bajis M. Dodin,et al. Production , Manufacturing and Logistics Integration of equipment planning and project scheduling , 2007 .
[19] Erhan Erkut,et al. Improving Volunteer Scheduling for the Edmonton Folk Festival , 2004, Interfaces.
[20] Atac Bascetin,et al. Optimization of shovel-truck system for surface mining , 2009 .
[21] E. Chanda,et al. Long Term Production Scheduling Optimisation for a Surface Mining Operation: An Application of MineMax™ Scheduling Software , 2002 .