Time-Cost Optimization of Construction Projects with Generalized Activity Constraints
暂无分享,去创建一个
[1] Robert I. Carr,et al. TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES , 1989 .
[2] D. R. Robinson. A Dynamic Programming Solution to Cost-Time Tradeoff for CPM , 1975 .
[3] Heng Li,et al. Using machine learning and GA to solve time-cost trade-off problems , 1999 .
[4] Srilal Perera. Linear Programming Solution to Network Compression , 1980 .
[5] Klaus Neumann,et al. Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints , 1995, J. Intell. Manuf..
[6] Prabuddha De,et al. The discrete time-cost tradeoff problem revisited , 1995 .
[7] W. Edward Back,et al. Probabilistic Optimal-Cost Scheduling , 2001 .
[8] Cengiz Haksever,et al. Flexible Model for Time'Cost Tradeoff Problem , 2004 .
[9] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[10] Chung-Wei Feng,et al. Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method , 1995 .
[11] Chung-Wei Feng,et al. Stochastic construction time-cost trade-off analysis , 2000 .
[12] S. Elmaghraby,et al. The Analysis of Activity Networks Under Generalized Precedence Relations GPRs , 1992 .
[13] Sou-Sen Leu,et al. GA-BASED MULTICRITERIA OPTIMAL MODEL FOR CONSTRUCTION SCHEDULING , 1999 .
[14] Zohar Laslo,et al. Activity time-cost tradeoffs under time and cost chance constraints , 2003 .
[15] D. D. Theodorakopoulos,et al. An Integer Programming Method for CPM Time-Cost Analysis , 2000 .
[16] Avraham Shtub,et al. Project management: engineering, technology, and implementation , 1994 .
[17] Martin Fischer,et al. Importance of Capacity Constraints to Construction Cost and Schedule , 2000 .
[18] L. Schrage. Optimization Modeling With LINDO , 1997 .
[19] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[20] Osman Coşkunog¯lu,et al. Optimal Probabilistic Compression of PERT Networks , 1984 .
[21] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[22] Demetrios Panagiotakopoulos. Cost-Time Model for Large CPM Project Networks , 1977 .
[23] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..