Comparison of just-in-time and time window delivery policies for a single-item capacitated lot sizing problem

In this article, a comparative discussion between just-in-time (JIT) and time window (TW) policies is performed for a special case of the single-item capacitated lot sizing problem (CLSP), in which two storage levels are available, including plant and customer levels. In the JIT policy, the customer demand has to be satisfied on the due date of the demand, however, in the TW policy, the shipment can be made a few days before the due date. The influence of the two policies on the total cost is studied for a structure of a single capacitated plant which replenishes a customer, both having storage spaces. Both planning problems are shown to be NP-hard using the well-known CLSP which constitutes their subpart. A mixed integer linear program and a pseudo-polynomial dynamic program are proposed for each policy. The objective of this article is first to solve the TW problem to the optimality and, second to show the gain obtained by TW policy in terms of cost reduction. For the benchmark, we used a large data set to see the influence of different parameters on the total cost.

[1]  Chung-Yee Lee,et al.  Dynamic lot-sizing problem with demand time windows and container-based transportation cost , 2008, Optim. Lett..

[2]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming , 2010 .

[3]  Stéphane Dauzère-Pérès,et al.  Single item lot sizing problems , 2006, Eur. J. Oper. Res..

[4]  Hark-Chin Hwang,et al.  Dynamic lot-sizing model with demand time windows and speculative cost structure , 2006, Oper. Res. Lett..

[5]  Hark-Chin Hwang An Efficient Procedure for Dynamic Lot-sizing Model with Demand Time Windows , 2007, J. Glob. Optim..

[6]  Laurence A. Wolsey,et al.  Polyhedral and Lagrangian approaches for lot sizing with production time windows and setup times , 2010, Comput. Oper. Res..

[7]  J. K. Lenstra,et al.  Deterministic Production Planning: Algorithms and Complexity , 1980 .

[8]  Marielle Christiansen,et al.  Industrial aspects and literature survey: Combined inventory management and routing , 2010, Comput. Oper. Res..

[9]  Chung Yee Lee,et al.  Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simple supply chain , 2004 .

[10]  Stéphane Dauzère-Pérès,et al.  Capacitated Multi-Item Lot-Sizing Problems with Time Windows , 2006, Oper. Res..

[11]  Philip M. Kaminsky,et al.  Production and Distribution Lot Sizing in a Two Stage Supply Chain , 2003 .

[12]  Laurence A. Wolsey,et al.  Lot-sizing with production and delivery time windows , 2005, Math. Program..

[13]  Albert P. M. Wagelmans,et al.  A Dynamic Lot-Sizing Model with Demand Time Windows , 1999, Manag. Sci..

[14]  Dong X. Shaw,et al.  An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs , 1998 .

[15]  Hark-Chin Hwang Dynamic lot-sizing model with production time windows , 2007 .

[16]  Yves Pochet,et al.  Valid inequalities for the single-item capacitated lot sizing problem with step-wise costs , 2009, Eur. J. Oper. Res..

[17]  FlorianM.,et al.  Deterministic Production Planning , 1980 .

[18]  Chung-Yee Lee,et al.  A Two-Echelon Inventory Optimization Model with Demand Time Window Considerations , 2004, J. Glob. Optim..

[19]  Zeger Degraeve,et al.  Modeling industrial lot sizing problems: a review , 2008 .