Procedures and models for estimating preconstruction costs of highway projects.

[1]  I-Tung Yang,et al.  Probabilistic simulation for developing likelihood distribution of engineering project cost , 2009 .

[2]  Helmut Schneider,et al.  In-House Versus Consultant Design Costs in State Departments of Transportation , 1999 .

[3]  Michael J. A. Berry,et al.  Data mining techniques - for marketing, sales, and customer support , 1997, Wiley computer publishing.

[4]  Paul G. Carr,et al.  Design Fees, the State of the Profession, and a Time for Corrective Action , 2005 .

[5]  Koshy Varghese,et al.  Forecastng Engineering Manpower Requirements for Highway Preconstruction Activities , 1995 .

[6]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[7]  Zhengxin Chen,et al.  Data Mining and Uncertain Reasoning: An Integrated Approach , 2001 .

[8]  Kumares C. Sinha,et al.  STATISTICAL MODELS FOR THE ESTIMATION OF BRIDGE REPLACEMENT COSTS , 1991 .

[9]  Douglas D. Gransberg,et al.  Relating Cost Growth from the Initial Estimate to Design Fee for Transportation Projects , 2007 .

[10]  Garold D. Oberlender,et al.  Predicting accuracy of early cost estimates based on estimate quality , 2001 .

[11]  Keith R. Molenaar,et al.  Programmatic Cost Risk Analysis for Highway Megaprojects , 2005 .

[12]  Aminah Robinson Fayek,et al.  Use of fuzzy logic for predicting design cost overruns on building projects , 2002 .

[13]  Khaled Nassar,et al.  Design Cost Analysis of Transportation Projects , 2005 .

[14]  Keith R. Molenaar,et al.  Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction , 2006 .