Manager Preferences Modelling for Stochastic Aggregate Planning

In the Aggregate Production Planning (APP) the manager considers simultaneously conflicting objectives such as total cost, inventories level, workforce fluctuation, and utilization level of the physical facility and equipment. The goals associated with these objectives may be uncertain in nature. The aim of this paper is to develop a Goal Programming (GP) model where the goals and the right-hand sides of constraints are random and normally distributed. The concept of satisfaction functions will be used for modeling the uncertainty as well as to explicitly integrate the manager preferences. The proposed model is applied to APP problem to generate the most satisfying aggregate plan.

[1]  A. Charnes,et al.  Chance-Constrained Programming , 1959 .

[2]  Jean-Marc Martel,et al.  Incorporating the Decision-maker's Preferences in the Goal-programming Model , 1990 .

[3]  Muhittin Oral,et al.  A Linearization Procedure for Quadratic and Cubic Mixed-Integer Problems , 1992, Oper. Res..

[4]  M. Gen,et al.  Method for solving multiobjective aggregate production planning problem with fuzzy parameters , 1992 .

[5]  A. Charnes,et al.  Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints , 1963 .

[6]  Robert F. Bordley,et al.  Multiattribute Preference Analysis with Performance Targets , 2004, Oper. Res..

[7]  Sidney W. Hess,et al.  A Linear Programming Approach to Production and Employment Scheduling , 1960 .

[8]  M. P. Biswal,et al.  Computation of some stochastic linear programming problems with Cauchy and extreme value distributions , 2005, Int. J. Comput. Math..

[9]  R. Jagannathan,et al.  Chance-Constrained Programming with Joint Constraints , 1974, Oper. Res..

[10]  Stephen C. H. Leung,et al.  A goal programming model for aggregate production planning with resource utilization constraint , 2009, Comput. Ind. Eng..

[11]  C. Hwang,et al.  An aggregate production planning model and application of three multiple objective decision methods , 1980 .

[12]  Yue Wu,et al.  Production , Manufacturing and Logistics A robust optimization model for multi-site production planning problem in an uncertain environment , 2007 .

[13]  Fouad Ben Abdelaziz,et al.  Stochastic programming with fuzzy linear partial information on time series , 2005 .

[14]  Bruno Contini,et al.  A Stochastic Approach to Goal Programming , 1968, Oper. Res..

[15]  Stephen C. H. Leung *,et al.  A robust optimization model for stochastic aggregate production planning , 2004 .

[16]  Ben Abdelaziz Foued,et al.  Application of goal programming in a multi-objective reservoir operation model in Tunisia , 2001, Eur. J. Oper. Res..

[17]  Reay-Chen Wang,et al.  Aggregate production planning with multiple objectives in a fuzzy environment , 2001, Eur. J. Oper. Res..

[18]  A. Charnes,et al.  Management Models and Industrial Applications of Linear Programming , 1961 .

[19]  P R Tozer,et al.  Producer breeding objectives and optimal sire selection. , 2002, Journal of dairy science.

[20]  Fouad Ben Abdelaziz,et al.  Decision-maker's preferences modeling in the stochastic goal programming , 2005, Eur. J. Oper. Res..

[21]  I. M. Stancu-Minasian,et al.  Stochastic Programming: with Multiple Objective Functions , 1985 .

[22]  Reay-Chen Wang,et al.  Applying possibilistic linear programming to aggregate production planning , 2005 .

[23]  E. H. Bowman Production Scheduling by the Transportation Method of Linear Programming , 1956 .

[24]  Adil Baykasoğlu MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search , 2001 .

[25]  H. Gfrerer,et al.  Hierarchical model for production planning in the case of uncertain demand , 1995 .