A Dual Multilateral Completion as an Alternative to Un-Wanted Water Control in Horizontal Wells
暂无分享,去创建一个
[1] A. S. Dossary,et al. Challenges and Achievements of Drilling Maximum Reservoir Contact (MRC) Wells in Shaybah Field , 2003 .
[2] Y. Jalali,et al. Flow Equilibration Towards Horizontal Wells Using Downhole Valves , 2001 .
[3] Michael T. Byrne,et al. Modelling the Near Wellbore and Formation Damage - a Comprehensive Review of Current and Future Options , 2011 .
[4] Travis W. Cavender. Summary of Multilateral Completion Strategies Used in Heavy Oil Field Development , 2004 .
[5] Fakhrizal Fakhrizal,et al. Selection Criteria for Successful Water Shut-Off Treatment - Brown Field Success Story , 2013 .
[6] Dean Lee,et al. Africa's first dual horizontal / dual completion multilateral well , 1998 .
[7] Fred Sabins,et al. Problems in Cementing Horizontal Wells , 1990 .
[8] Khafiz Muradov,et al. Reduction of the horizontal well's heel–toe effect with inflow control devices , 2010 .
[9] Taha Mousrafa Moawad,et al. Case Study: Utilizing of Inflow Control Device To Control Oil Wells from Water Production and Regulate Waterfront Encroachment , 2013 .
[10] Knut Herman Henriksen,et al. Case Study: The Application of Inflow Control Devices in the Troll Field , 2006 .
[11] P. Rae,et al. New Insights into Water Control - A Review of the State of the Art , 2002 .