Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines

[1]  I. Grossmann,et al.  Planning models for parallel batch reactors with sequence‐dependent changeovers , 2007 .

[2]  C. Maravelias,et al.  An attainable region approach for production planning of multiproduct processes , 2007 .

[3]  I. Grossmann,et al.  A Decomposition Method for the Simultaneous Planning and Scheduling of Single-Stage Continuous Multiproduct Plants , 2006 .

[4]  Marianthi G. Ierapetritou,et al.  Efficient short-term scheduling of refinery operations based on a continuous time formulation , 2004, Comput. Chem. Eng..

[5]  Lazaros G. Papageorgiou,et al.  A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants , 2004, Comput. Chem. Eng..

[6]  Jaime Cerdá,et al.  An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities , 2002 .

[7]  I. Grossmann,et al.  Cyclic scheduling of continuous parallel‐process units with decaying performance , 1998 .

[8]  Nilay Shah,et al.  RTN-based rolling horizon algorithms for medium term scheduling of multipur-pose plants , 1997 .

[9]  Matthew H. Bassett,et al.  Decomposition techniques for the solution of large-scale scheduling problems , 1996 .

[10]  J. M. Pinto,et al.  Mixed-Integer Linear Programming Model for Refinery Short-Term Scheduling of Crude Oil Unloading with Inventory Management , 1996 .

[11]  C. Pantelides,et al.  Optimal Campaign Planning/Scheduling of Multipurpose Batch/Semicontinuous Plants. 2. A Mathematical Decomposition Approach , 1996 .

[12]  Nilay Shah,et al.  Mathematical programming techniques for crude oil scheduling , 1996 .

[13]  Nilay Shah,et al.  Aggregate modelling of multipurpose plant operation , 1995 .

[14]  J. M. Pinto,et al.  Optimal cyclic scheduling of multistage continuous multiproduct plants , 1994 .

[15]  R. Sargent,et al.  A general algorithm for short-term scheduling of batch operations */I , 1993 .

[16]  Donald L. Miller,et al.  Exact Solution of Large Asymmetric Traveling Salesman Problems , 1991, Science.

[17]  I. Grossmann,et al.  MINLP model for cyclic multiproduct scheduling on continuous parallel lines , 1991 .

[18]  Ignacio E. Grossmann,et al.  Multiperiod LP models for simultaneous production planning and scheduling in multiproduct batch plants , 1990 .

[19]  E. Balas,et al.  Canonical Cuts on the Unit Hypercube , 1972 .