Multi-level condition-based maintenance planning for railway infrastructures – A scenario-based chance-constrained approach
暂无分享,去创建一个
Bart De Schutter | Ali Jamshidi | Simone Baldi | Alfredo Núñez | Zhou Su | B. Schutter | A. Jamshidi | A. Núñez | Z. Su | S. Baldi
[1] Evanghelos Zafiriou,et al. Robust process control , 1987 .
[2] Eduardo F. Camacho,et al. Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturing , 2008, Eur. J. Oper. Res..
[3] S. Fararooy,et al. Condition-based maintenance of railway signalling equipment , 1995 .
[4] Eduardo F. Camacho,et al. Hierarchical distributed model predictive control for risk mitigation: An irrigation canal case study , 2011, Proceedings of the 2011 American Control Conference.
[5] Carlos Bordons Alba,et al. Model Predictive Control , 2012 .
[6] A. Zoeteman. Life cycle cost analysis for managing rail infrastructure , 2001 .
[7] ScienceDirect. Reliability engineering & system safety , 1988 .
[8] Bart De Schutter,et al. Model Predictive Control for Maintenance Operations Planning of Railway Infrastructures , 2015, ICCL.
[9] Hakan Guler,et al. Decision Support System for Railway Track Maintenance and Renewal Management , 2013 .
[10] Dennis Huisman,et al. Scheduling preventive railway maintenance activities , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).
[11] J. M. Grosso,et al. Chance-Constrained Model Predictive Control for Drinking Water Networks , 2014 .
[12] Rob M.P. Goverde,et al. Modeling railway disruption lengths with Copula Bayesian Networks , 2016 .
[13] Uday Kumar,et al. Optimisation of maintenance track possession time: A tamping case study , 2015 .
[14] V. Torczon,et al. Direct search methods: then and now , 2000 .
[15] James B. Rawlings,et al. Postface to “ Model Predictive Control : Theory and Design ” , 2012 .
[16] Dan M. Frangopol,et al. Probabilistic models for life‐cycle performance of deteriorating structures: review and future directions , 2004 .
[17] Eduardo F. Camacho,et al. A hierarchical distributed model predictive control approach to irrigation canals: A risk mitigation perspective , 2011 .
[18] Rolf Dollevoet,et al. Improvements in Axle Box Acceleration Measurements for the Detection of Light Squats in Railway Infrastructure , 2015, IEEE Transactions on Industrial Electronics.
[19] B. De Schutter,et al. Hierarchical Operation of Water Level Controllers: Formal Analysis and Application on a Large Scale Irrigation Canal , 2014, Water Resources Management.
[20] Do Thompson,et al. Ultrasonic surface wave propagation and interaction with surface defects on rail track head , 2006 .
[21] Mohammed Ben‐Daya,et al. Introduction to Maintenance Engineering: Modelling, Optimization and Management , 2016 .
[22] Qing He,et al. Track geometry defect rectification based on track deterioration modelling and derailment risk assessment , 2015, J. Oper. Res. Soc..
[23] D. N. P. Murthy,et al. Complex System Maintenance Handbook , 2008 .
[24] Yanfeng Ouyang,et al. Optimal Clustering of Railroad Track Maintenance Jobs , 2014, Comput. Aided Civ. Infrastructure Eng..
[25] E Schnieder,et al. Monte Carlo simulation of railway track geometry deterioration and restoration , 2012 .
[26] Samer Madanat,et al. Optimal infrastructure management decisions under uncertainty , 1993 .
[27] Rommert Dekker,et al. Optimal maintenance of multi-component systems: a review , 2008 .
[28] Anders Ekberg,et al. Predicting crack growth and risks of rail breaks due to wheel flat impacts in heavy haul operations , 2007 .
[29] Paulo Fonseca Teixeira,et al. Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level , 2016 .
[30] Buyue Qian,et al. Improving rail network velocity: A machine learning approach to predictive maintenance , 2014 .
[31] Rui Li,et al. Optimization of preventive condition-based tamping for railway tracks , 2016, Eur. J. Oper. Res..
[32] Rui Santos,et al. Heuristic Analysis of the Effective Range of a Track Tamping Machine , 2012 .
[33] Alberto Bemporad,et al. Control of systems integrating logic, dynamics, and constraints , 1999, Autom..
[34] Rolf Dollevoet,et al. Robust and predictive fuzzy key performance indicators for condition-based treatment of squats in railway infrastructures , 2017 .
[35] Rommert Dekker,et al. Applications of maintenance optimization models : a review and analysis , 1996 .
[36] Xinbiao Xiao,et al. Development of a simulation model for dynamic derailment analysis of high-speed trains , 2014 .
[37] Manfred Morari,et al. Robust Model Predictive Control , 1987, 1987 American Control Conference.
[38] Daniel E. Rivera,et al. An Improved Formulation of Hybrid Model Predictive Control With Application to Production-Inventory Systems , 2013, IEEE Transactions on Control Systems Technology.
[39] Samer Madanat,et al. Optimization of inspection and maintenance decisions for infrastructure facilities under performance model uncertainty: A quasi-Bayes approach , 2008 .
[40] B. De Schutter,et al. Time-instant optimization for hybrid model predictive control of the Rhine–Meuse delta , 2010 .
[41] Sophie Mercier,et al. Bivariate Gamma wear processes for track geometry modelling, with application to intervention scheduling , 2012 .
[42] Ramin Karim,et al. Improvement of railway performance: a study of Swedish railway infrastructure , 2016 .
[43] Daniel Limon,et al. Computationally efficient nonlinear Min–Max Model Predictive Control based on Volterra series models—Application to a pilot plant , 2013 .
[44] Paolo Toth,et al. A three-level framework for performance-based railway timetabling , 2015 .
[45] John D. Andrews,et al. Optimal Scheduling of Track Maintenance on a Railway Network , 2013, Qual. Reliab. Eng. Int..
[46] B. De Schutter. Optimal traffic light control for a single intersection , 1999 .
[47] Samer Madanat,et al. Optimal Inspection and Maintenance Policies for Infrastructure Networks , 2000 .
[48] Tsutomu Yamada,et al. Detection of Damage and Crack in Railhead by Using Eddy Current Testing , 2011 .
[49] Andrew Higgins. Scheduling of railway track maintenance activities and crews , 1998, J. Oper. Res. Soc..
[50] Rob M.P. Goverde,et al. The ON-TIME real-time railway traffic management framework: A proof-of-concept using a scalable standardised data communication architecture , 2016 .
[51] Daming Lin,et al. A review on machinery diagnostics and prognostics implementing condition-based maintenance , 2006 .
[52] András Prékopa,et al. ON PROBABILISTIC CONSTRAINED PROGRAMMING , 2015 .
[53] Yanfeng Ouyang,et al. Track maintenance production team scheduling in railroad networks , 2012 .
[54] Philip A. Scarf,et al. On the application of mathematical models in maintenance , 1997 .
[55] Mohammed Ben‐Daya,et al. Condition‐Based Maintenance , 2016 .
[56] David Q. Mayne,et al. Constrained model predictive control: Stability and optimality , 2000, Autom..
[57] Yanfeng Ouyang,et al. A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem , 2011, Comput. Aided Civ. Infrastructure Eng..
[58] Rob M.P. Goverde,et al. An integrated micro–macro approach to robust railway timetabling , 2016 .
[59] Carlos Ocampo-Martinez,et al. Stock management in hospital pharmacy using chance-constrained model predictive control , 2016, Comput. Biol. Medicine.