Supply chain coordination model with controllable lead time and service level constraint
暂无分享,去创建一个
[1] L. Ouyang,et al. Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .
[2] Hojung Shin,et al. A quantity discount approach to supply chain coordination , 2007, Eur. J. Oper. Res..
[3] L. Ouyang,et al. An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .
[4] Fei Ye,et al. Cost allocation model for optimizing supply chain inventory with controllable lead time , 2010, Comput. Ind. Eng..
[5] Patrick S. Chen,et al. Improved inventory models with service level and lead time , 2005, Comput. Oper. Res..
[6] Liwen Liu,et al. Supply chain coordination with quantity discount policy , 2006 .
[7] L. Ouyang,et al. Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .
[8] Sven Axsäter. Inventory Control when the Lead-time Changes , 2011 .
[9] Yu-Jen Lin,et al. An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost , 2009, Comput. Ind. Eng..
[10] Z. K. Weng,et al. Channel coordination and quantity discounts , 1995 .
[11] Jason Chao-Hsien Pan,et al. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .
[12] J C-H Pan,et al. Inventory models with fixed and variable lead time crash costs considerations , 2002, J. Oper. Res. Soc..
[13] Eric Sucky,et al. Production , Manufacturing and Logistics A bargaining model with asymmetric information for a single supplier – single buyer problem , 2005 .
[14] C. Liao,et al. An Analytical Determination of Lead Time with Normal Demand , 1991 .
[15] James P. Monahan. A Quantity Discount Pricing Model to Increase Vendor Profits , 1984 .
[16] Abdul Raouf,et al. Inventory Models Involving Lead Time as a Decision Variable , 1994 .
[17] Liang-Yuh Ouyang,et al. Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..
[18] Kripa Shanker,et al. Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..
[19] Mohamed Ben-Daya,et al. Lead-time reduction in a stochastic inventory system with learning consideration , 2003 .
[20] R. J. Tersine,et al. Lead‐time reduction: the search for competitive advantage , 1995 .
[21] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[22] Charles L. Munson,et al. Incorporating quantity discounts and their inventory impacts into the centralized purchasing decision , 2010, Eur. J. Oper. Res..
[23] Liang-Yuh Ouyang,et al. Mixture inventory model involving variable lead time with a service level constraint , 1997, Comput. Oper. Res..