A multi-constrained supply chain model with optimal production rate in relation to quality of products under stochastic fuzzy demand
暂无分享,去创建一个
[1] Biswajit Sarkar,et al. Optimizing a Multi-Product Continuous-Review Inventory Model With Uncertain Demand, Quality Improvement, Setup Cost Reduction, and Variation Control in Lead Time , 2018, IEEE Access.
[2] Seyyed M. T. Fatemi Ghomi,et al. Flexible supply chain optimization with controllable lead time and shipping option , 2015, Appl. Soft Comput..
[3] J. Pan,et al. Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain , 2008 .
[4] Yu-Jen Lin,et al. A periodic review inventory model involving fuzzy expected demand short and fuzzy backorder rate , 2008, Comput. Ind. Eng..
[5] Byung Soo Kim,et al. A Constrained Production System Involving Production Flexibility and Carbon Emissions , 2020, Mathematics.
[6] Shu-Lu Hsu,et al. An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction , 2001 .
[7] M. Mahdi Tajbakhsh,et al. On the distribution free continuous-review inventory model with a service level constraint , 2010, Comput. Ind. Eng..
[8] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[9] G. Gallego,et al. The Distribution Free Newsboy Problem: Review and Extensions , 1993 .
[10] Seyed Taghi Akhavan Niaki,et al. A genetic algorithm for vendor managed inventory control system of multi-product multi-constraint economic order quantity model , 2011, Expert Syst. Appl..
[11] Shib Sankar Sana,et al. The (p, q, r, l) model for stochastic demand under Intuitionistic fuzzy aggregation with Bonferroni mean , 2018, J. Intell. Manuf..
[12] Chandra K. Jaggi,et al. A multi-retailer supply chain model with backorder and variable production cost , 2018, RAIRO Oper. Res..
[13] Ata Allah Taleizadeh,et al. Constraint multiproduct joint-replenishment inventory control problem using uncertain programming , 2011, Appl. Soft Comput..
[14] Liang-Yuh Ouyang,et al. Fuzzy inventory model for deteriorating items with permissible delay in payment , 2006, Appl. Math. Comput..
[15] Shib Sankar Sana,et al. Fuzzy order quantity inventory model with fuzzy shortage quantity and fuzzy promotional index , 2013 .
[16] Shib Sankar Sana,et al. Multi-item fuzzy economic production quantity model with multiple deliveries , 2020, Soft Comput..
[17] Dongmin Shin,et al. Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model , 2016, RAIRO Oper. Res..
[18] Namhun Kim,et al. Effects of variable production rate on quality of products in a single-vendor multi-buyer supply chain management , 2018, The International Journal of Advanced Manufacturing Technology.
[19] Biswajit Sarkar,et al. Disruption management in a constrained multi-product imperfect production system , 2020, Journal of Manufacturing Systems.
[20] Biswajit Sarkar,et al. An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders , 2018 .
[21] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[22] S. Zanoni,et al. Energy considerations for the economic production quantity and the joint economic lot sizing , 2019, Journal of Business Economics.
[23] Biswajit Sarkar,et al. A Two-Echelon Supply Chain Management With Setup Time and Cost Reduction, Quality Improvement and Variable Production Rate , 2019, Mathematics.
[24] Biswajit Sarkar,et al. Integrated vendor-buyer supply chain model with vendor's setup cost reduction , 2013, Appl. Math. Comput..
[25] Christoph H. Glock. Batch sizing with controllable production rates , 2010 .
[26] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[27] Jing-Shing Yao,et al. Ranking fuzzy numbers based on decomposition principle and signed distance , 2000, Fuzzy Sets Syst..
[28] S. T. A. Niaki,et al. A two-echelon single-period inventory control problem under budget constraint , 2011 .
[29] Shib Sankar Sana,et al. A multi-periods production-inventory model with capacity constraints for multi-manufacturers - A global optimality in intuitionistic fuzzy environment , 2014, Appl. Math. Comput..
[30] Guoqing Zhang,et al. Analysis of two substitute products newsvendor problem with a budget constraint , 2020, Comput. Ind. Eng..
[31] Christoph H. Glock,et al. Batch sizing with controllable production rates in a multi-stage production system , 2011 .
[32] Ilkyeong Moon,et al. Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level constraint , 2015 .
[33] Shib Sankar Sana,et al. New approach based on proximity/remoteness measurement for customer classification , 2020, Electron. Commer. Res..
[34] Shib Sankar Sana,et al. Self-assessment of parallel network systems with intuitionistic fuzzy data: a case study , 2019, Soft Comput..
[35] Ata Allah Taleizadeh,et al. Multiple-buyer multiple-vendor multi-product multi-constraint supply chain problem with stochastic demand and variable lead-time: A harmony search algorithm , 2011, Appl. Math. Comput..
[36] S. Goyal,et al. An integrated inventory model involving manufacturing setup cost reduction in compound Poisson process , 2011 .
[37] Shib Sankar Sana,et al. Two-layer supply chain model for Cauchy-type stochastic demand under fuzzy environment , 2018, Int. J. Intell. Comput. Cybern..
[38] Leopoldo Eduardo Cárdenas-Barrón,et al. A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints , 2020, Ann. Oper. Res..
[39] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[40] Alain Bensoussan,et al. Optimizing production and inventory decisions in a supply chain with lot size, production rate and lead time interactions , 2013, Appl. Math. Comput..
[41] Biswajit Sarkar,et al. Effect of Electrical Energy on the Manufacturing Setup Cost Reduction, Transportation Discounts, and Process Quality Improvement in a Two-Echelon Supply Chain Management under a Service-Level Constraint , 2019 .
[42] M. Jaber,et al. Supply chain models with greenhouse gases emissions, energy usage and different coordination decisions , 2015 .
[43] Naoufel Cheikhrouhou,et al. Optimization of sample size and order size in an inventory model with quality inspection and return of defective items , 2018, Ann. Oper. Res..
[44] Reza Tavakkoli-Moghaddam,et al. Lead time and ordering cost reductions in budget and storage space restricted probabilistic inventory models with imperfect items , 2015, RAIRO Oper. Res..
[45] Rongbing Huang,et al. Integrated pricing and lot-sizing decision in a two-echelon supply chain with a finite production rate , 2015 .
[46] Cengiz Kahraman,et al. A Fuzzy Multiphase and Multicriteria Decision-Making Method for Cutting Technologies Used in Shipyards , 2016, Int. J. Fuzzy Syst..
[47] B. Sarkar,et al. A Distribution-Free Model with Variable Setup Cost, Backorder Price Discount and Controllable Lead Time , 2018, DJ Journal of Engineering and Applied Mathematics.
[48] Christoph H. Glock,et al. A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate , 2017 .
[49] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[50] Bijoy Kumar Shaw,et al. An integrated inventory model with variable transportation cost, two-stage inspection, and defective items , 2017 .
[51] Abraham Mehrez,et al. Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality , 1994 .
[52] Biswajit Sarkar,et al. Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory , 2020, Mathematics.
[53] Adrijit Goswami,et al. An interpolating by pass to Pareto optimality in intuitionistic fuzzy technique for a EOQ model with time sensitive backlogging , 2014, Appl. Math. Comput..
[54] Seyed Taghi Akhavan Niaki,et al. A parameter-tuned genetic algorithm to solve multi-product economic production quantity model with defective items, rework, and constrained space , 2010 .
[55] C. Liao,et al. An Analytical Determination of Lead Time with Normal Demand , 1991 .
[56] Shib Sankar Sana,et al. Hybrid improved cuckoo search algorithm and genetic algorithm for solving Markov-modulated demand , 2018, RAIRO Oper. Res..
[57] Adrijit Goswami,et al. A continuous review production-inventory system in fuzzy random environment: Minmax distribution free procedure , 2015, Comput. Ind. Eng..
[58] Shib Sankar Sana,et al. Evaluation and selecting the contractor in bidding with incomplete information using MCGDM method , 2019, Soft Comput..
[59] Oshmita Dey,et al. A fuzzy random integrated inventory model with imperfect production under optimal vendor investment , 2019, Oper. Res..
[60] Shib Sankar Sana,et al. A mathematical model on eco-friendly manufacturing system under probabilistic demand , 2019, RAIRO Oper. Res..
[61] Namhun Kim,et al. Impact of safety factors and setup time reduction in a two-echelon supply chain management , 2019, Robotics and Computer-Integrated Manufacturing.
[62] Byung Do Chung,et al. Flexible work-in-process production system in supply chain management under quality improvement , 2020, Int. J. Prod. Res..
[63] Biswajit Sarkar,et al. Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction , 2019, Mathematics.