Direct load control considering interrupted energy assessment rate in restructured power systems

A direct load control (DLC) scheme of air conditioning loads (ACL), which considers the interrupted energy assessment rate (IEAR) of nodes where ACL are connected, is proposed in this paper for restructured power systems. The IEAR is utilized to determine the compensation for the discomfort of the ACL customers due to the service interruption caused by the DLC of ACL. Dynamic programming is used to determine the optimal DLC scheme of ACL under the minimum total system operating cost. The IEEE reliability test system is simulated to illustrate the proposed DLC technique of ACL.

[1]  Roy Billinton,et al.  Customer cost of electric service interruptions , 1989, Proc. IEEE.

[2]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[3]  Hossein Salehfar,et al.  Modeling and Evaluation of the System Reliability Effects of Direct Load Control , 1989, IEEE Power Engineering Review.

[4]  R. Adapa,et al.  Scheduling direct load control to minimize system operation cost , 1995 .

[5]  Roy Billinton,et al.  Reliability evaluation of power systems , 1984 .

[6]  R. Słowiński Fuzzy sets in decision analysis, operations research and statistics , 1999 .

[7]  M. Shahidehpour,et al.  Restructured Electrical Power Systems: Operation: Trading, and Volatility , 2001 .

[8]  Yuan-Yih Hsu,et al.  Fuzzy dynamic programming: an application to unit commitment , 1991 .

[9]  Yonghua Song,et al.  Operation of market-oriented power systems , 2003 .

[10]  Allen J. Wood,et al.  Power Generation, Operation, and Control , 1984 .

[11]  Bruce A. Smith,et al.  Generalizing Direct Load Control Program Analysis: Implementation of the Duty Cycle Approach , 1989, IEEE Power Engineering Review.

[12]  H. Salehfar,et al.  A production costing methodology for evaluation of direct load control , 1991, IEEE Power Engineering Review.

[13]  A. I. Cohen,et al.  An optimization method for load management scheduling , 1988 .

[14]  Charles Goldman,et al.  Demand responsive programs - an emerging resource for competitive electricity markets? , 2001 .

[15]  M. Bollen,et al.  Operation of restructured power systems , 2001 .

[16]  N. E. Ryan,et al.  Generalizing direct load control program analysis , 1989 .

[17]  Gerald B. Sheblé,et al.  Direct load control-A profit-based load management using linear programming , 1998 .

[18]  Yuan-Yih Hsu,et al.  Dispatch of direct load control using dynamic programming , 1991 .

[19]  Hong-Tzer Yang,et al.  Direct load control using fuzzy dynamic programming , 1999 .

[20]  Philip G. Hill,et al.  Power generation , 1927, Journal of the A.I.E.E..

[21]  S. S. Venkata,et al.  ADSM-an automated distribution system modeling tool for engineering analyses , 1995 .

[22]  Nanming Chen,et al.  Air conditioner direct load control by multi-pass dynamic programming , 1995 .