End-of-life asset planning and management with retrofitting
暂无分享,去创建一个
[1] A. Oliveira. Medical Equipment Replacement: Economic Analysis under Deterministic and Uncertain Environments , 2012 .
[2] Adrien Presley,et al. The theory and practice of Reverse Logistics , 2007 .
[3] Claude Lemaréchal,et al. Lagrangian Relaxation , 2000, Computational Combinatorial Optimization.
[4] Manu Sharma,et al. Asset management with reverse product flows and environmental considerations , 2007, Comput. Oper. Res..
[5] Yu Ding,et al. Supplement to : Optimal Maintenance Strategies for Wind Turbine Systems Under Stochastic Weather Conditions , 2010 .
[6] Erik Sundin,et al. Reverse logistics challenges in remanufacturing of automotive mechatronic devices , 2013 .
[7] Peter Tavner,et al. Reliability analysis for wind turbines with incomplete failure data collected from after the date of initial installation , 2009, Reliab. Eng. Syst. Saf..
[8] Shuo-Yan Chou,et al. Optimizing reverse logistic costs for recycling end-of-life electrical and electronic products , 2012, Expert Syst. Appl..
[9] Suresh K. Nair,et al. A model for equipment replacement due to technological obsolescence , 1992 .
[10] Yu Ding,et al. Season-Dependent Condition-Based Maintenance for a Wind Turbine Using a Partially Observed Markov Decision Process , 2010, IEEE Transactions on Power Systems.
[11] James E. Ward,et al. A model for parallel machine replacement with capacity expansion , 2000, Eur. J. Oper. Res..
[12] J.A.E.E. van Nunen,et al. Designing and Evaluating Sustainable Logistics Networks , 2006 .
[13] Randy B Machemehl,et al. Equipment Replacement Decision Making: Opportunities and Challenges , 2013 .
[14] Anna Nagurney,et al. Reverse supply chain management and electronic waste recycling: a multitiered network equilibrium framework for e-cycling , 2005 .
[15] Dequan Yue,et al. Availability Equivalence Analysis of a Repairable Series-Parallel System , 2012 .
[16] Eleftherios Iakovou,et al. Optimal Sourcing Decisions for Unreliable Reverse Supply Chains , 2011, Asia Pac. J. Oper. Res..
[17] A. J. Seebregts,et al. Reliability analysis in wind turbine engineering , 1995 .
[18] Thomas D. Ashwill,et al. Cost Study for Large Wind Turbine Blades , 2003 .
[19] Mohammed Kishk,et al. Modelling System Failures to Optimise Wind Turbine Maintenance , 2007 .
[20] Vildan Özkir,et al. Modelling product-recovery processes in closed-loop supply-chain network design , 2012 .
[21] Nathalie Bostel,et al. A facility location model for logistics systems including reverse flows: The case of remanufacturing activities , 2007, Comput. Oper. Res..
[22] Maureen Hand,et al. IEA Wind Task 26: The Past and Future Cost of Wind Energy, Work Package 2 , 2012 .
[23] Michael Pecht,et al. Using maintenance options to maximize the benefits of prognostics for wind farms , 2014 .
[24] Zissimos P. Mourelatos,et al. Optimal Preventive Maintenance Schedule Based on Lifecycle Cost and Time-Dependent Reliability , 2012 .
[25] Akshay Mutha,et al. Perspectives in reverse logistics : A review , 2009 .
[26] Tahar Benmessaoud,et al. Influence of Maintenance on the Performance of a Wind farm , 2013 .
[27] A. H. Christer,et al. A Robust Replacement Model with Applications to Medical Equipment , 1994 .
[28] Leonardo Dueñas-Osorio,et al. A Closed-Form Technique for the Reliability and Risk Assessment of Wind Turbine Systems , 2012 .
[29] Sosa Skrainka,et al. Analysis of the Environmental Impact on Remanufacturing Wind Turbines , 2012 .
[30] M K Chien,et al. AN EMPIRICAL STUDY OF THE IMPLEMENTATION OF GREEN SUPPLY CHAIN MANAGEMENT PRACTICES IN THE LECTRICAL AND ELECTRONIC INDUSTRY AND THEIR RELATION TO ORGANIZATIONAL PERFORMANCES , 2007 .
[31] Eric Benjamin Beier. Subgradient-based Decomposition Methods for Stochastic Mixed-integer Programs with Special Structures , 2011 .
[32] Anne Liret,et al. The Asset Replacement Problem State of the Art , 2013, Transforming Field and Service Operations.
[33] Suresh K. Nair,et al. MARKOVIAN DETERIORATION AND TECHNOLOGICAL CHANGE , 1994 .
[34] J. Rubio-Romero,et al. A model for the preventive maintenance scheduling of power plants including wind farms , 2013, Reliab. Eng. Syst. Saf..
[35] Philip A. Scarf,et al. On the application of mathematical models in maintenance , 1997 .
[36] M. Figliozzi,et al. Transit Bus Fleet Age and Replacement Type Optimization , 2013 .
[37] J. C. Smith,et al. Parallel Asset Replacement Problem under Economies of Scale with Multiple Challengers , 2014 .
[38] Gülfem Tuzkaya,et al. A methodology for the strategic design of reverse logistics networks and its application in the Turkish white goods industry , 2011 .
[39] Snehamay Khasnabis,et al. Multiobjective Optimization Model for Transit Fleet Resource Allocation , 2013 .
[40] Reynaldo Cruz-Rivera,et al. Production , Manufacturing and Logistics Reverse logistics network design for the collection of End-of-Life Vehicles in Mexico , 2009 .
[41] B. Hahn,et al. Reliability of Wind Turbines , 2007 .
[42] Karl R. Haapala,et al. Comparative life cycle assessment of 2.0 MW wind turbines , 2014 .
[43] Marshall L. Fisher,et al. The Lagrangian Relaxation Method for Solving Integer Programming Problems , 2004, Manag. Sci..
[44] N. Subramanian,et al. Factors for implementing end-of-life computer recycling operations in reverse supply chains , 2012 .
[45] Yacov Y Haimes,et al. On the Definition of Resilience in Systems , 2009, Risk analysis : an official publication of the Society for Risk Analysis.
[46] Marisa de Brito,et al. Reverse Logistics: A Review of Case Studies , 2004 .
[47] Harald Sander,et al. Reverse Logistics for Waste Electrical and Electronic Equipment (WEEE) in China Application of Linear Programming to Eco-Innovation in Industry , 2011 .
[48] Jesse Boudart,et al. Bus Replacement Modeling and the Impacts of Budget Constraints, Fleet Cost Variability, and Market Changes on Fleet Costs and Optimal Bus Replacement Age, A Case Study , 2011 .
[49] Michael Patriksson,et al. Preventive maintenance scheduling of multi-component systems with interval costs , 2014, Comput. Ind. Eng..
[50] J. Hartman,et al. Integrated Production Planning and Parallel Replacement Analysis , 2002 .
[51] Roland Geyer,et al. Supply Loops and Their Constraints: The Industrial Ecology of Recycling and Reuse , 2004 .
[52] J. C. Bean,et al. Parallel replacement under capital rationing constraints , 1994 .
[53] Wallace J. Hopp,et al. Parallel machine replacement , 1991 .
[54] G. Ault,et al. Condition monitoring benefit for onshore wind turbines: sensitivity to operational parameters , 2008 .
[55] H. Oliver Gao,et al. Reducing transit fleet emissions through vehicle retrofits, replacements, and usage changes over multiple time periods , 2010 .
[56] Suresh K. Nair,et al. Timing replacement decisions under discontinuous technological change , 1991 .
[57] Jesse A. Andrawus. Maintenance optimisation for wind turbines. , 2008 .
[58] Reeba Sara George. A study of the reliability enhancement of wind turbines employing direct-drive technology , 2012 .
[59] Joseph C. Hartman,et al. Multiple asset replacement analysis under variable utilization and stochastic demand , 2004, Eur. J. Oper. Res..
[60] Julia Nilsson. Maintenance management of wind power systems Cost effect analysis of condition monitoring systems , 2006 .
[61] Jiuh-Biing Sheu,et al. A coordinated reverse logistics system for regional management of multi-source hazardous wastes , 2007, Comput. Oper. Res..
[62] Edgar G. Hertwich,et al. Assessing the life cycle environmental impacts of wind power: A review of present knowledge and research needs , 2012 .
[63] Craig C. Sherbrooke,et al. Optimal Inventory Modeling of Systems , 1992 .
[64] S. Rajagopalan,et al. Capacity Expansion and Equipment Replacement: A Unified Approach , 1998, Oper. Res..
[65] Jonathan S. Krones. Reverse Logistics and Large-Scale Material Recovery from Electronics Waste , 2007 .
[66] Agostino Villa,et al. Optimization models and concepts in production management , 1995 .
[67] Rrk Sharma,et al. Lagrangian based approach to solve a two level capacitated lot sizing problem , 2015 .
[68] D. Diamond,et al. U.S. Department of Energy Critical Materials Strategy , 2010 .
[69] María Isabel Blanco. The economics of wind energy , 2009 .
[70] Saeed Mansour,et al. A multi-period reverse logistics optimisation model for end-of-life vehicles recovery based on EU Directive , 2008, Int. J. Comput. Integr. Manuf..
[71] Peter Putz,et al. Subgradient Optimization Based Lagrangian Relaxation and Relax-and-Cut Approaches for the Bounded-Diameter Minimum Spanning Tree Problem , 2007 .
[72] P. C. Schuur,et al. Business case Océ: Reverse logistic network re-design for copiers , 1999 .
[73] L. Bertling,et al. A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems , 2005, IEEE Transactions on Power Systems.
[74] David McMillan,et al. Assessing Wind Farm Reliability Using Weather Dependent Failure Rates , 2014 .
[75] Lina Bertling,et al. An Approach for Condition-Based Maintenance Optimization Applied to Wind Turbine Blades , 2010, IEEE Transactions on Sustainable Energy.
[76] Gao,et al. Hazard Model Reliability Analysis Based on a Wind Generator Condition Monitoring System , 2014 .
[77] Tetsuo Tomiyama,et al. Reliability of wind turbine technology through time , 2008 .
[78] Prem Vrat,et al. A goal programming model for paper recycling system , 2008 .
[79] E. Abensur. OPTIMIZATION MODELS APPLIED TO EQUIPMENT REPLACEMENT POLICY , 2010 .
[80] Vicente González-Prida,et al. State of the Art of Maintenance Applied to Wind Turbines , 2013 .
[81] J. Hartman. A GENERAL PROCEDURE FOR INCORPORATING ASSET UTILIZATION DECISIONS INTO REPLACEMENT ANALYSIS , 1999 .
[82] Zhe George Zhang,et al. A Computational Model for Determining the Optimal Preventive Maintenance Policy With Random Breakdowns and Imperfect Repairs , 2007, IEEE Transactions on Reliability.
[83] Ryan Wiser. 2012 Wind Technologies Market Report , 2014 .
[84] Shawki Abouel-Seoud,et al. Cost Optimization of Maintenance Scheduling for Wind Turbine Gearbox Components with Assured Reliability , 2013 .
[85] Jonas Lundin,et al. Spare Part Logistics and Optimization for Wind Turbines : Methods for Cost-Effective Supply and Storage , 2010 .
[86] Dennis Huisman,et al. Scheduling preventive railway maintenance activities , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).
[87] Enrico Zio,et al. Reliability assessment of generic geared wind turbines by GTST-MLD model and Monte Carlo simulation , 2015 .
[88] Sophie Bernard. Remanufacturing , 2010 .
[89] Drew Liming,et al. Careers in Wind Energy , 2011 .
[90] Zhi-Long Chen. Solution algorithms for the parallel replacement problem under economy of scale , 1998 .
[91] H. Oliver Gao,et al. Developing green fleet management strategies: Repair/retrofit/replacement decisions under environmental regulation , 2012 .
[92] Nejat. Karabakal,et al. SOLVING LARGE REPLACEMENT PROBLEMS WITH BUDGET CONSTRAINTS , 2000 .
[93] José Torres Farinha,et al. Time replacement optimization models for urban transportation buses with indexation to fleet reserve , 2014 .
[94] Suresh K. Nair,et al. Modeling Strategic Investment Decisions Under Sequential Technological Change , 1995 .
[95] Chandra Lalwani,et al. Reverse logistics network design: a state-of-the-art literature review , 2009, Int. J. Bus. Perform. Supply Chain Model..
[96] J. Hartman,et al. A mixed-integer programming approach to the parallel replacement problem under technological change , 2016 .
[97] C. Ghenai. Life Cycle Analysis of Wind Turbine , 2012 .
[98] Jesper B. Sørensen,et al. Aging, Obsolescence, and Organizational Innovation , 2000 .
[99] F. P. de Jong. Development of a model to estimate O&M costs for onshore wind farms , 2007 .
[100] T. Morton,et al. Capacity Expansion and Replacement in Growing Markets with Uncertain Technological Breakthroughs , 1998 .
[101] Selin Soner Kara,et al. A stochastic optimization approach for paper recycling reverse logistics network design under uncertainty , 2010 .
[102] L. Frantzis,et al. Offshore Wind Market and Economic Analysis , 2013 .
[103] Joseph C. Hartman,et al. CASE STUDY: BUS FLEET REPLACEMENT , 2004 .
[104] Erik Rolland,et al. The design of reverse distribution networks: Models and solution procedures , 2003, Eur. J. Oper. Res..
[105] Der-Horng Lee,et al. A HEURISTIC APPROACH TO LOGISTICS NETWORK DESIGN FOR END-OF-LEASE COMPUTER PRODUCTS RECOVERY , 2008 .
[106] J. Hartman. The parallel replacement problem with demand and capital budgeting constraints , 2000 .
[107] M. Zoback,et al. Disaster Resilience: A National Imperative , 2013 .
[108] Krishna B. Misra,et al. Handbook of Performability Engineering , 2008 .
[110] James J Winebrake,et al. Optimal Fleetwide Emissions Reductions for Passenger Ferries: An Application of a Mixed-Integer Nonlinear Programming Model for the New York–New Jersey Harbor , 2005, Journal of the Air & Waste Management Association.
[111] Hoang Pham,et al. System Reliability Concepts , 2006 .
[112] Mahmood Shafiee,et al. An FMEA-Based Risk Assessment Approach for Wind Turbine Systems: A Comparative Study of Onshore and Offshore , 2014 .