An error components model of cost overruns and schedule slip on army R&D programs
暂无分享,去创建一个
[1] Robin Thompson. Iterative Estimation of Variance Components for Non-Orthogonal Data , 1969 .
[2] Sanford Labovitz,et al. The Assignment of Numbers to Rank Order Categories , 1970 .
[3] Gordon Wade Arbogast. The Effect of TRACE on Cost Overruns and Development Time for Army Weapon System R&D Programs , 1986 .
[4] Wayne A. Fuller,et al. Estimation of linear models with crossed-error structure , 1974 .
[5] John A. Finchum. Expectation of contract incentives , 1972 .
[6] Robert G. Easierling. An Anatomy of Risk , 1977 .