The Underwater Way

To meet tougher drinking water standards, the design of a new system to bypass the lower reservoir in Los Angeles’s Stone Canyon Reservoir Complex features a 4,300 ft (1,311 m) long pipeline of high-density polyethylene that runs along the bottom of the reservoir. The innovative solution helped reduce the cost of the project by more than $10 million.