Accelerated Life Test Plans for Predicting Warranty Cost
暂无分享,去创建一个
[1] W. Blischke,et al. Warranty Cost Analysis , 2008 .
[2] W. Nelson. Statistical Methods for Reliability Data , 1998 .
[3] W. Meeker. A Comparison of Accelerated Life Test Plans for Weibull and Lognormal Distributions and Type I Censoring , 1984 .
[4] W. Meeker. Accelerated Testing: Statistical Models, Test Plans, and Data Analyses , 1991 .
[5] W. B. Nelson,et al. A bibliography of accelerated test plans part II - references , 2005, IEEE Transactions on Reliability.
[6] Guangbin Yang,et al. Accelerated life tests at higher usage rates , 2005, IEEE Trans. Reliab..
[7] D. N. Prabhakar Murthy,et al. Reliability assessment based on two-dimensional warranty data and an accelerated failure time model , 2008 .
[8] H. V. Poor,et al. EM and SAGE algorithms for multi-user detection , 1994, Proceedings of 1994 Workshop on Information Theory and Statistics.
[9] Loon Ching Tang,et al. A multiple objective framework for planning accelerated life tests , 2005, IEEE Trans. Reliab..
[10] Yili Hong,et al. Using Accelerated Life Tests Results to Predict Product Field Reliability , 2009, Technometrics.
[11] Wayne Nelson,et al. Ch. 22. Prediction of field reliability of units, each under differing dynamic stresses, from accelerated test data , 2001 .
[12] Ling Jin,et al. Best compromise test plans for weibull distributions with different censoring times , 1994 .
[13] Vasiliy V. Krivtsov. Practical extensions to NHPP application in repairable system reliability analysis , 2007, Reliab. Eng. Syst. Saf..
[14] J. Bert Keats,et al. Statistical Methods for Reliability Data , 1999 .
[15] W. B. Nelson,et al. A bibliography of accelerated test plans , 2005, IEEE Transactions on Reliability.
[16] Guangbin Yang. Life cycle reliability engineering , 2007 .