A group decision-making method based on intuitionistic fuzzy set in the three dimensional concurrent engineering environment: a multi-objective programming approach
暂无分享,去创建一个
[1] Liang-Chuan Wu,et al. Supplier selection under uncertainty: a switching options perspective , 2009, Ind. Manag. Data Syst..
[2] Wendy L. Tate,et al. Product‐process‐supply chain: an integrative approach to three‐dimensional concurrent engineering , 2007 .
[3] H. Zimmermann. Fuzzy programming and linear programming with several objective functions , 1978 .
[4] Jennifer Blackhurst,et al. PCDM: a decision support modeling methodology for supply chain, product and process design decisions , 2005 .
[5] Krassimir T. Atanassov,et al. Intuitionistic fuzzy sets , 1986 .
[6] Alain Bernard,et al. A hybrid method to select best process and suppliers, in the concurrent engineering environment , 2011 .
[7] Bimal Nepal,et al. Integrated fuzzy logic-based model for product modularization during concept development phase , 2005 .
[8] Sebastian K. Fixson,et al. Product architecture assessment: a tool to link product, process, and supply chain design decisions , 2005 .
[9] Peggy Zwolinski,et al. Integrated design of product lifecycles—The fridge case study , 2008 .
[10] T. Y. Reddy,et al. Engineering design. A materials and processing approach: by G. Dieter, McGraw Hill International Book Co., Tokyo, 1983, ISBN 0-07-066265-7, xiv + 592 pages, Illustrated, flexi-cover, £9.50 , 1986 .
[11] Alain Bernard,et al. A multi-objective programming approach, integrated into the TOPSIS method, in order to optimize product design; in three-dimensional concurrent engineering , 2013, Comput. Ind. Eng..
[12] Ge Wang,et al. Product-driven supply chain selection using integrated multi-criteria decision-making methodology , 2004 .
[13] Lisa M. Ellram,et al. Integrating strategic cost management with a 3DCE environment: Strategies, practices, and benefits , 2008 .
[14] Janusz Kacprzyk,et al. Distances between intuitionistic fuzzy sets , 2000, Fuzzy Sets Syst..