Information Systems Projects and Individual Developer Outcomes: Role of Project Managers and Process Control

We integrate control theory and the information systems IS project management literature using a multilevel lens to theorize the cross-level effects of technical IS project risk on individual developer outcomes-performance and psychological stress-and the mechanisms by which IS project managers' project-related knowledge attenuates this relationship. We argue that IS project managers with project-related knowledge mitigate technical IS project risk by facilitating the enactment of internal and external process controls in their IS projects. Our empirical study involves data collected from 1,230 individual developers embedded in 130 IS project teams that are managed by 20 IS project managers. Our results provide strong support for the three-level model and its set of a cross-level main effects of technical IS project risk on individual developer outcomes; b cross-level main effects of IS project manager project-related knowledge on enacted internal and external process controls; and c cross-level moderation of the relationship between technical IS project risk and individual developer outcomes by IS project manager project-related knowledge through internal and external process controls. Our study provides insights on how IS project management, IS project process controls, and technical IS project risk must be managed as a system of multilevel dependencies to achieve the desired developer outcomes. The online appendix is available at https://doi.org/10.1287/isre.2017.0723 .

[1]  James D. Herbsleb,et al.  Familiarity, Complexity, and Team Performance in Geographically Distributed Software Development , 2007, Organ. Sci..

[2]  William R. King,et al.  Predictors of Formal Control Usage in IT Outsourcing Partnerships , 2008, Inf. Syst. Res..

[3]  Jane V. Wheeler,et al.  Managing from the boundary: The effective leadership of self-managing work teams , 2003 .

[4]  L. Hunter,et al.  Feeling the Heat: Effects of Stress, Commitment, and Job Experience on Job Performance , 2007 .

[5]  Amrit Tiwana,et al.  Control in Internal and Outsourced Software Projects , 2009, J. Manag. Inf. Syst..

[6]  J. Edwards,et al.  Methods for integrating moderation and mediation: a general analytical framework using moderated path analysis. , 2007, Psychological methods.

[7]  Shan Liu,et al.  How user risk and requirements risk moderate the effects of formal and informal control on the process performance of IT projects , 2013, Eur. J. Inf. Syst..

[8]  Anandasivam Gopal,et al.  Research Note - The Role of Organizational Controls and Boundary Spanning in Software Development Outsourcing: Implications for Project Performance , 2010, Inf. Syst. Res..

[9]  D. Rousseau Issues of level in organizational research: Multi-level and cross-level perspectives. , 1985 .

[10]  S. West,et al.  Multiple Regression: Testing and Interpreting Interactions. , 1994 .

[11]  J. Mathieu,et al.  The Etiology of the Multilevel Paradigm in Management Research , 2011 .

[12]  Sandra Slaughter,et al.  The Effectiveness of Knowledge Transfer Portfolios in Software Process Improvement: A Field Study , 2006, Inf. Syst. Res..

[13]  Nathan P. Podsakoff,et al.  A Meta-Analytic Test of the Challenge Stressor–Hindrance Stressor Framework: An Explanation for Inconsistent Relationships Among Stressors and Performance , 2005 .

[14]  June M. Verner,et al.  In-house software development: what project management practices lead to success? , 2005, IEEE Software.

[15]  Paul D. Bliese,et al.  Being Both Too Liberal and Too Conservative: The Perils of Treating Grouped Data as though They Were Independent , 2004 .

[16]  Mark Keil,et al.  Understanding software project risk: a cluster analysis , 2004, Inf. Manag..

[17]  R. Ryan Nelson,et al.  IT Project Management: Infamous Failures, Classic Mistakes, and Best Practices , 2007, MIS Q. Executive.

[18]  Chris F. Kemerer,et al.  Ieee Transactions on Software Engineering, Manuscript Id 1 Does Software Process Improvement Reduce the Severity of Defects? a Longitudinal Field Study , 2022 .

[19]  Mark Keil,et al.  Why software projects escalate: the importance of project management constructs , 2003, IEEE Trans. Engineering Management.

[20]  Viswanath Venkatesh,et al.  A Control Theory Perspective on Agile Methodology Use and Changing User Requirements , 2009, Inf. Syst. Res..

[21]  Murray R. Barrick,et al.  Relating member ability and personality to work-team processes and team effectiveness. , 1998 .

[22]  R. Sohi,et al.  IT competency and firm performance: is organizational learning a missing link? , 2003 .

[23]  H. Marsh,et al.  Application of confirmatory factor analysis to the study of self-concept: First- and higher order factor models and their invariance across groups. , 1985 .

[24]  Marco Iansiti,et al.  Special Issue on Design and Development: Developing Products on "Internet Time": The Anatomy of a Flexible Development Process , 2001, Manag. Sci..

[25]  Aleksander P. J. Ellis System Breakdown: The Role of Mental Models and Transactive Memory in the Relationship between Acute Stress and Team Performance , 2006 .

[26]  Likoebe M. Maruping,et al.  Offshore information systems project success: the role of social embeddedness and cultural characteristics , 2009 .

[27]  Mark Keil,et al.  How Software Project Risk Affects Project Performance: An Investigation of the Dimensions of Risk and an Exploratory Model , 2004, Decis. Sci..

[28]  C. Judd,et al.  When moderation is mediated and mediation is moderated. , 2005, Journal of personality and social psychology.

[29]  P. Costa,et al.  The revised NEO personality inventory (NEO-PI-R) , 2008 .

[30]  Amrit Tiwana,et al.  Systems Development Process Improvement: A Knowledge Integration Perspective , 2007, IEEE Transactions on Engineering Management.

[31]  Deborah G. . Ancona Outward Bound: Strategic for Team Survival in an Organization , 1990 .

[32]  Xiaojun Zhang,et al.  Role of collective ownership and coding standards in coordinating expertise in software project teams , 2009, Eur. J. Inf. Syst..

[33]  L. James,et al.  Estimating within-group interrater reliability with and without response bias. , 1984 .

[34]  M. Markus,et al.  Information technology and organizational change: causal structure in theory and research , 1988 .

[35]  Deborah G. . Ancona,et al.  Bridging the Boundary: External Activity and Performance in Organizational Teams. , 1992 .

[36]  J. Mathieu,et al.  Empowerment and team effectiveness: an empirical test of an integrated model. , 2006, The Journal of applied psychology.

[37]  R. Keller,et al.  Cross-Functional Project Groups in Research and New Product Development: Diversity, Communications, Job Stress, and Outcomes , 2001 .

[38]  Daniel J. Bauer,et al.  Conceptualizing and testing random indirect effects and moderated mediation in multilevel models: new procedures and recommendations. , 2006, Psychological methods.

[39]  Wanda J. Orlikowski,et al.  Information Technology and the Structuring of Organizations , 2011 .

[40]  Richard S. Lazarus,et al.  Stress and Emotion: A New Synthesis , 1999 .

[41]  Hoang Pham,et al.  An analysis of factors affecting software reliability , 2000, J. Syst. Softw..

[42]  P. Bliese Within-group agreement, non-independence, and reliability: Implications for data aggregation and analysis. , 2000 .

[43]  Robert W. Zmud,et al.  A Contingency Approach to Software Project Coordination , 2002, J. Manag. Inf. Syst..

[44]  M. Feldman,et al.  Routines as a Source of Change in Organizational Schemata: The Role of Trial-and-Error Learning , 2011 .

[45]  D. Mackinnon,et al.  Multilevel Modeling of Individual and Group Level Mediated Effects , 2001, Multivariate behavioral research.

[46]  M. Lindell,et al.  Accounting for common method variance in cross-sectional research designs. , 2001, The Journal of applied psychology.

[47]  T. DeCotiis,et al.  Organizational Determinants of Job Stress , 1983 .

[48]  Roel Bosker,et al.  Multilevel analysis : an introduction to basic and advanced multilevel modeling , 1999 .

[49]  Nannette P. Napier,et al.  IT project managers' construction of successful project management practice: a repertory grid investigation , 2009, Inf. Syst. J..

[50]  A. Hayes Beyond Baron and Kenny: Statistical Mediation Analysis in the New Millennium , 2009 .

[51]  K. Klein,et al.  Levels Issues in Theory Development, Data Collection, and Analysis , 1994 .

[52]  Rudy Hirschheim,et al.  Towards a distinctive body of knowledge for Information Systems experts: coding ISD process knowledge in two IS journals , 2004, Inf. Syst. J..

[53]  Laurie J. Kirsch,et al.  Portfolios of Control Modes and IS Project Management , 1997, Inf. Syst. Res..

[54]  Anthony S. Bryk,et al.  Hierarchical Linear Models: Applications and Data Analysis Methods , 1992 .

[55]  James J. Jiang,et al.  Important Behavioral Skills for is Project Managers: The Judgments of Experienced is Professionals , 1998 .

[56]  John E. Gaffney,et al.  Software Function, Source Lines of Code, and Development Effort Prediction: A Software Science Validation , 1983, IEEE Transactions on Software Engineering.

[57]  E. Salas,et al.  Does Stress Lead to a Loss of Team Perspective , 1999 .

[58]  Thiagarajan Ravichandran,et al.  Quality Management in Systems Development: An Organizational System Perspective , 2000, MIS Q..

[59]  S. Kozlowski,et al.  Multilevel Theory, Research, a n d M e t h o d s i n Organizations Foundations, Extensions, and New Directions , 2022 .

[60]  Likoebe M. Maruping,et al.  Folding Under Pressure or Rising to the Occasion? Perceived Time Pressure and the Moderating Role of Team Temporal Leadership , 2014, SSRN Electronic Journal.

[61]  Kah-Hin Chai,et al.  A Double-Edged Sword: The Effects of Challenge and Hindrance Time Pressure on New Product Development Teams , 2011, IEEE Transactions on Engineering Management.

[62]  J. Alberto Espinosa,et al.  Learning from Experience in Software Development: A Multilevel Analysis , 2007, Manag. Sci..

[63]  Jeffrey R. Edwards,et al.  An Examination Of Competing Versions Of The Person-Environment Fit Approach To Stress , 1996 .

[64]  John G. Lynch,et al.  Reconsidering Baron and Kenny: Myths and Truths about Mediation Analysis , 2010 .

[65]  Jason Bennett Thatcher,et al.  IS Employee Attitudes and Perceptions at Varying Levels of Software Process Maturity , 2012, MIS Q..

[66]  Mani R. Subramani,et al.  The Matrix of Control: Combining Process and Structure Approaches to Managing Software Development , 2003, J. Manag. Inf. Syst..

[67]  Sarma R. Nidumolu The Effect of Coordination and Uncertainty on Software Project Performance: Residual Performance Risk as an Intervening Variable , 1995, Inf. Syst. Res..

[68]  Ronald F. Piccolo,et al.  A META‐ANALYSIS OF TEAMWORK PROCESSES: TESTS OF A MULTIDIMENSIONAL MODEL AND RELATIONSHIPS WITH TEAM EFFECTIVENESS CRITERIA , 2008 .

[69]  Kalle Lyytinen,et al.  Identifying Software Project Risks: An International Delphi Study , 2001, J. Manag. Inf. Syst..

[70]  Cecil Eng Huang Chua,et al.  Enacting Clan Control in Complex IT Projects: A Social Capital Perspective , 2012, MIS Q..

[71]  David A. Hofmann,et al.  Centering Decisions in Hierarchical Linear Models: Implications for Research in Organizations , 1998 .

[72]  Heidi K. Gardner,et al.  Performance Pressure as a Double-edged Sword , 2012 .

[73]  John E. Mathieu,et al.  A Temporally Based Framework and Taxonomy of Team Processes , 2001 .

[74]  Russell L. Purvis,et al.  Controlling Information Systems Development Projects: The View from the Client , 2002, Manag. Sci..

[75]  R. Lazarus Psychological stress in the workplace. , 1989, Journal of UOEH.

[76]  Rajiv D. Banker,et al.  The Moderating Effects of Structure on Volatility and Complexity in Software Enhancement , 2000, Inf. Syst. Res..

[77]  Tao Chen,et al.  How User and Requirement Risks Moderate the Effects of Formal and Informal Controls on IT Project Performance , 2008, ICIS.

[78]  M. Hoegl,et al.  Teamwork Quality and the Success of Innovative Projects , 2001 .

[79]  Viswanath Venkatesh,et al.  Technical Systems Development Risk Factors: The Role of Empowering Leadership in Lowering Developers’ Stress , 2017, Inf. Syst. Res..

[80]  Jin Nam Choi External Activities and Team Effectiveness , 2002 .