Phase-based externality analysis for large hydropower projects

[1]  P. Samuelson,et al.  Foundations of Economic Analysis. , 1948 .

[2]  Chris Chapman,et al.  Risk-management perspective on the project lifecycle , 1995 .

[3]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[4]  Faizul Huq Testing in the software development life-cycle: now or later , 2000 .

[5]  Jeroen B. Guinee,et al.  Handbook on life cycle assessment operational guide to the ISO standards , 2002 .

[6]  Role of Dams in Irrigation, Drainage and Flood Control , 2002 .

[7]  M. Hauschild,et al.  A Framework for Social Life Cycle Impact Assessment (10 pp) , 2006 .

[8]  Martin Pehnt,et al.  Dynamic life cycle assessment (LCA) of renewable energy technologies , 2006 .

[9]  Bryan W. Karney,et al.  Life-Cycle Inventory of Energy Use and Greenhouse Gas Emissions for Two Hydropower Projects in China , 2007 .

[10]  Andreas Jørgensen,et al.  Methodologies for social life cycle assessment , 2008 .

[11]  Muhammad Asif,et al.  Sustainable energy options for Pakistan , 2009 .

[12]  David Pennington,et al.  Recent developments in Life Cycle Assessment. , 2009, Journal of environmental management.

[13]  Bryan Tilt,et al.  Social impacts of large dam projects: a comparison of international case studies and implications for best practice. , 2009, Journal of environmental management.

[14]  Varun,et al.  LCA of renewable energy for electricity generation systems—A review , 2009 .

[15]  Sreya Maitra Development Induced Displacement: Issues of Compensation and Resettlement – Experiences from the Narmada Valley and Sardar Sarovar Project , 2009, Japanese Journal of Political Science.

[16]  Xie Li-fang Discussion on calculation of economic benefits for inland navigation and electricity junction , 2009 .

[17]  U. A. D. Prasanthi Gunawardena,et al.  Inequalities and externalities of power sector: A case of Broadlands hydropower project in Sri Lanka , 2010 .

[18]  J. Kujala,et al.  A project lifecycle perspective on stakeholder influence strategies in global projects , 2010 .

[19]  Shinichiro Fujimori,et al.  Assessment of China's climate commitment and non-fossil energy plan towards 2020 using hybrid AIM/CGE model , 2011 .

[20]  Varun,et al.  Life cycle greenhouse gas emissions estimation for small hydropower schemes in India , 2012 .

[21]  Pu Wang,et al.  A framework for social impact analysis of large dams: a case study of cascading dams on the Upper-Mekong River, China. , 2012, Journal of environmental management.

[22]  James P. Lassoie,et al.  Compensation policy for displacement caused by dam construction in China: An institutional analysis , 2013 .

[23]  M. Qiang,et al.  Risk management of hydropower development in China , 2013 .

[24]  Sarah Jacobson,et al.  Those Outsiders: How Downstream Externalities Affect Public Good Provision , 2014 .

[25]  A. Dinar,et al.  THE ROLE OF ISSUE LINKAGE IN MANAGING NONCOOPERATING BASINS: THE CASE OF THE MEKONG , 2014 .

[26]  Hitoshi Furuta,et al.  Life-cycle of structural systems: design, assessment, maintenance and management , 2014 .

[27]  Pieter de Jong,et al.  Economic and environmental analysis of electricity generation technologies in Brazil , 2015 .

[28]  Ruochen Zeng,et al.  Social responsibility of major infrastructure projects in China , 2015 .

[29]  Linyu Xu,et al.  Review on the externalities of hydropower: A comparison between large and small hydropower projects in Tibet based on the CO2 equivalent , 2015 .

[30]  Seth Sheldon,et al.  Beyond carbon: Quantifying environmental externalities as energy for hydroelectric and nuclear power , 2015 .

[31]  C. Tortajada,et al.  Dams: An Essential Component of Development , 2015 .

[32]  S. Thomas Ng,et al.  A social life cycle assessment model for building construction in Hong Kong , 2015, The International Journal of Life Cycle Assessment.

[33]  I. Logar,et al.  Hydropower externalities: A meta-analysis , 2016 .

[34]  K. Artto,et al.  From the front end of projects to the back end of operations: Managing projects for value creation throughout the system lifecycle , 2016 .

[35]  Peng Lin,et al.  Finding academic concerns of the Three Gorges Project based on a topic modeling approach , 2016 .

[36]  Volker Mauerhofer Introduction to the Special Issue : Public participation in environmental and land use policy in East Asia , 2016 .

[37]  Francesca Verones,et al.  Impacts from hydropower production on biodiversity in an LCA framework—review and recommendations , 2016, The International Journal of Life Cycle Assessment.

[38]  M. Qiang,et al.  An externality evaluation model for hydropower projects: A case study of the Three Gorges Project , 2016 .

[39]  Factors influencing immigrants’ satisfaction in Danjiangkou Reservoir based on logistic regression model , 2016 .

[40]  Hong-ya Gu NIMBYism in China: Issues and prospects of public participation in facility siting , 2016 .

[41]  C. Liang,et al.  The ecological benefit–loss evaluation in a riverine wetland for hydropower projects – A case study of Xiaolangdi reservoir in the Yellow River, China , 2016 .

[42]  E. Ahmadi,et al.  Assessment of environment impacts of egg production chain using life cycle assessment. , 2016, Journal of environmental management.

[43]  Peng Lin,et al.  Public-Opinion Sentiment Analysis for Large Hydro Projects , 2016 .

[44]  Brooke Wilmsen After the Deluge: A longitudinal study of resettlement at the Three Gorges Dam, China , 2016 .

[45]  Julian Kirchherr,et al.  Cleaning Up the Big Muddy: A Meta-Synthesis of the Research on the Social Impact of Dams , 2016 .

[46]  Akhil Kadiyala,et al.  Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems , 2016 .