A Practical Approach To Evaluating The Marginal Outage Costs In Generating Systems
暂无分享,去创建一个
[1] Roy Billinton,et al. Power System Spinning Reserve Determination in a Multi System Configuration , 1973 .
[2] Arun P. Sanghvi,et al. Flexible Strategies for Load/Demand Management Using Dynamic Pricing , 1989, IEEE Power Engineering Review.
[3] R. Billinton,et al. Comparison of Two Alternate Methods to Establish an Interrupted Energy Assessment Rate , 1987, IEEE Transactions on Power Systems.
[4] Roy Billinton,et al. Evaluation of the marginal outage costs of generating systems for the purposes of spot pricing , 1994 .
[5] Roy Billinton,et al. Comparison of alternative techniques for evaluating the marginal outage costs of generating systems , 1993 .
[6] Fereidoon P. Sioshansi. The pros and cons of spot pricing — electric utility perspective , 1988 .
[7] Probability Subcommittee,et al. IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.
[8] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[9] C.K. Pang,et al. Multi-area generation system reliability calculations , 1975, IEEE Transactions on Power Apparatus and Systems.