Sustainable BIM-Based Cost Estimating for Quantity Surveyors

Construction cost estimates provided by the Quantity Surveyors are constantly producing errors and inaccuracies due to unmanageable circumstances. Unreliable cost estimates are developed throughout the project stages in which can create more complications towards finishing the projects. The Building Information Modelling (BIM) technology has increasingly become prominent nowadays to facilitate the construction industry stakeholders to overcome those issues. Its exemplary benefits experienced by the users demonstrate that BIM could efficiently assist the cost estimators to establish more reliable measurement of the building quantities that would significantly determine part of the total project costs. BIM automation in the quantities take-off would reduce changes and reworks that effectively improves the development of the costs. This mechanism obliquely governs the Quantity Surveyors as estimators to practise more sustainable practice in establishing more reliable cost estimates. This paper reviews the potentials of the BIM innovation to aid the Quantity Surveyors towards establishing more sustainable practice when incorporates the technology in their cost estimating procedures. It combines the three aspects of people, process and technology in compelling the BIM-based cost estimating to function at its optimum performance. In integrating these three aspects, not only the Quantity Surveyors need to be competent in adapting BIM tools, but also to traditionally master the fundamental of building measurement. By establishing those holistic criteria to incorporate BIM in their cost estimating practice, dealing with other disciplines in the project team will be much easier and BIM application for the intended project will be at its optimum usage.

[1]  Phuwadol Samphaongoen,et al.  A Visual Approach to Construction Cost Estimating , 2010 .

[2]  Umit Isikdag,et al.  Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies , 2009 .

[3]  Fkw Wong,et al.  Building information modelling in material take-off in a Hong Kong project , 2009 .

[4]  Willy Sher,et al.  Building information modeling and quantity surveying practice , 2010 .

[5]  Hs Jayasena,et al.  Building information modelling and future quantity surveyor’s practice in Sri Lankan construction industry , 2013 .

[6]  Muhd Zaimi Abd Majid,et al.  Weightage factor for criteria of design & construction for green highway , 2017 .

[7]  J. Boon Evolution of Quantity Surveying Practice in the Use of BIM – the New Zealand Experience , 2012 .

[8]  K. Sylvester,et al.  Evaluation of Building Information Modeling ( BIM ) Estimating Methods in Construction Education , 2010 .

[9]  Zulkiflee Abdul-Samad,et al.  The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia , 2013 .

[10]  João Pedro Poças Martins,et al.  A survey on modeling guidelines for quantity takeoff-oriented BIM-based design , 2013 .

[11]  Pavan Meadati,et al.  Integrating Construction Process Documentation into Building Information Modeling , 2008 .

[12]  Hs Jayasena,et al.  Automation of BIM quantity take-off to suit QS’s requirements , 2019 .

[13]  G. R. Brundtland Our Common Future World Commission on Environment and Development , 1987 .

[14]  H. van Meerveld Reflections on estimating : the effects of project complexity and the use of BIM on the estimating process , 2009 .

[15]  A. Borrmann Building Information Modeling Building Information Modelling , 2015 .

[16]  Rozana Zakaria,et al.  Investigation of green assessment criteria & sub-criteria for public hospital building development in Malaysia , 2017 .

[17]  Robin Drogemuller,et al.  Exploring accuracy factors in cost estimating practice towards implementing Building Information Modelling (BIM) , 2015 .

[18]  Raja R. A. Issa,et al.  Quantitative evaluation of the BIM-assisted construction detailed cost estimates , 2010, J. Inf. Technol. Constr..

[19]  Hafez Salleh,et al.  The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance , 2014 .

[20]  Niraj Thurairajah,et al.  Advantages and Challenges of Using BIM: a Cost Consultant’s Perspective , 2013 .

[21]  R. L. Peurifoy Estimating Construction Costs , 1953 .