Shop Floor Control When Tacit Worker Knowledge is Important

We investigate a shop where the workers and supervisors have tacit knowledge of how to operate efficiently and where efficiency is important to providing capacity to meet demand. This tacit knowledge includes setup dependencies between products as well as which worker or machine is best suited for a particular product. We discuss a real-world shop where this is the case. Management expects workers and supervisors to use their knowledge to schedule efficiently by monitoring their performance based on standards. The question that we explore is how management should control for due date performance in light of the discretion given to the workers and supervisors to sequence jobs on the basis of efficiency. We explore management control of due date performance through the use of order review and release (ORR) and management expediting. We find that although ORR is quite effective at reducing work-in-process (WIP) inventories, it may foster very late deliveries in a shop such as this. In fact, under such conditions, deftly executed expediting with no ORR at all can be far more effective at supporting all deliveries. Even improving ORR into a hybrid by actively updating path efficiencies (observed from supervisor/worker scheduling) did not support a change to this conclusion. Conversely, when conditions are created where tacit knowledge plays a reduced role or utilization is decreased, ORR delivers in a timely manner. The interaction between utilization, WIP levels, and worker knowledge all help dictate the appropriate control methodology.

[1]  Lawrence D. Fredendall,et al.  Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .

[2]  J Jaap Wessels,et al.  Diagnosing order planning performance at a navy maintenance and repair organization, using logistic regression , 2009 .

[3]  John B. Jensen,et al.  An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .

[4]  R. Haupt,et al.  A survey of priority rule-based scheduling , 1989 .

[5]  Wolter J. Fabrycky,et al.  An Input/Output Control System For The Dynamic Job Shop , 1987 .

[6]  Vincent A. Mabert,et al.  AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .

[7]  Barbara B. Flynn Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops , 1987 .

[8]  S. S. Panwalkar,et al.  Sequencing Research and the Industrial Scheduling Problem , 1973 .

[9]  Jon K. Wilbrecht,et al.  The Influence of Setup Time on Job Shop Performance , 1969 .

[10]  A. Alan B. Pritsker Introduction to simulation and SLAM II (2nd ed.) , 1984 .

[11]  Paul M. Bobrowski Implementing a loading heuristic in a discrete release job shop , 1989 .

[12]  J. W. M Bertrand,et al.  Workload based order release and productivity: a missing link , 2002 .

[13]  V. Barnett,et al.  Applied Linear Statistical Models , 1975 .

[14]  S. C. Kim,et al.  Impact of sequence-dependent setup time on job shop scheduling performance , 1994 .

[15]  J. J. Kanet Load-limited order release in job shop scheduling systems , 1988 .

[16]  David M. Miller,et al.  A study of expediting practices in manufacturing firms , 1990 .

[17]  Kenneth R. Baker,et al.  The effects of input control in a simple scheduling model , 1984 .

[18]  M. Lieberman,et al.  Inventory Reduction and Productivity Growth: Linkages in the Japanese Automotive Industry , 1999 .

[19]  T. T. Narendran,et al.  Heuristics and sequence-dependent set-up jobs in flow line cells , 2003 .

[20]  Vincent C. S. Wiers,et al.  The complexity of scheduling in practice , 1996 .

[21]  Hiroshi Awane,et al.  Input scheduling and load balance control for a job shop , 1984 .

[22]  Jatinder N. D. Gupta,et al.  A review of scheduling research involving setup considerations , 1999 .

[23]  Jan Fransoo,et al.  Ordering Behavior in Retail Stores and Implications for Automated Replenishment , 2010, Manag. Sci..

[24]  Vcs Vincent Wiers,et al.  From anecdotes to theory: a review of existing knowledge on human factors of planning and scheduling , 2001 .

[25]  Timothy D. Fry,et al.  Order review/release in the absence of adherence to formal scheduling policies , 1999 .

[26]  Linda Hendry,et al.  Alternative order release mechanisms: a comparison by simulation , 1994 .