A Hierarchical System of Performance Measures for Concurrent Engineering
暂无分享,去创建一个
[1] Joseph D. Blackburn,et al. The time factor , 1990 .
[2] R. Kaplan. Measuring manufacturing performance: a new challenge for managerial accounting research , 1983 .
[3] B. Smith. Six-sigma design (quality control) , 1993, IEEE Spectrum.
[4] Charu Chandra,et al. Time-based strategies—Theory and practice , 1993 .
[5] K. Zinser,et al. Concurrent engineering , 1993, IEEE Spectrum.
[6] Thomas H. Johnson,et al. Relevance Lost: The Rise and Fall of Management Accounting , 1987 .
[7] R. Kaplan,et al. PUTTING THE BALANCED SCORECARD TO WORK , 1993 .
[8] C. Meyer. How the right measures help teams excel , 1994 .
[9] Kenneth D. Ramsing,et al. Manufacturing in the corporate strategy , 1979 .
[10] David A. Gatenby,et al. Concurrent engineering: An enabler for fast, high-quality product realization , 1994, AT&T Technical Journal.
[11] Thomas M. Hout,et al. How time‐based management measures performance , 1990 .
[12] R. I. Winner,et al. The Role of Concurrent Engineering in Weapons System Acquisition , 1988 .
[13] R. Kaplan,et al. The balanced scorecard--measures that drive performance. , 2015, Harvard business review.