A Lean Six Sigma framework for the reduction of ship loading commercial time in the iron ore pelletising industry

Abstract Evidence suggests that specifically designed frameworks to implement Lean Six Sigma (LSS) projects to tackle particular problems are more effective than ‘generic’ versions. This paper proposes an implementation framework to effectively deploy LSS to improve a key operation and performance indicator, i.e. ship loading commercial time, of one of the largest world producer of iron ore. This article therefore contributes with a refined framework to effectively implement LSS, and documents its successful application and effectiveness within the context of the case organisation. The LSS framework and project contributed in helping the studied organisation to improve both the capability of its ship loading process and commercial time by more than 30%, resulting in operational savings in the range of $300,000 USD per year. The systematic nature of the framework proposed also helped the organisation to establish a standardised routine to improve its operations. Managerial implications exposing the challenges faced during the implementation of LSS are also discussed to serve as lessons learnt to be considered in other LSS projects. Managers and engineers incharge of improving operations and processes can benefit from this paper as it can be used as a guide to direct the conduction of LSS projects and the empirical application of its principles and tools.

[1]  Chris Hicks,et al.  Applying lean principles to the design of healthcare facilities , 2015 .

[2]  D. Coghlan,et al.  Action research for operations management , 2002 .

[3]  R. MacCoun Experimental and Quasi‐Experimental Designs for Generalized Causal Inference, by William R. Shadish, Thomas D. Cook, and Donald T. Campbell. Boston: Houghton Mifflin, 2001, 623 pp., $65.56. , 2003 .

[4]  Jose Arturo Garza-Reyes,et al.  Building Quality Management Systems: Selecting the Right Methods and Tools , 2013 .

[5]  Christopher A. Voss,et al.  Case research in operations management , 2002 .

[6]  P. Hines,et al.  Learning to evolve: A review of contemporary lean thinking , 2004 .

[7]  Jeroen de Mast,et al.  An analysis of the Six Sigma DMAIC method from the perspective of problem solving , 2012 .

[8]  Soemon Takakuwa,et al.  Using Operation Process Simulation for a Six Sigma project of Mining and Iron Production Factory , 2008, 2008 Winter Simulation Conference.

[9]  S. Vinodh,et al.  Implementing lean sigma framework in an Indian automotive valves manufacturing organisation: a case study , 2011 .

[10]  Vaidyanathan Jayaraman,et al.  Managing information and supplies inventory operations in a manufacturing environment. Part 1: An action research study , 2012 .

[11]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[12]  Nihar Ranjan Senapati,et al.  Six Sigma: myths and realities , 2004 .

[13]  Pius Achanga,et al.  Critical success factors for lean implementation within SMEs , 2006 .

[14]  Thomas Pyzdek,et al.  The Six Sigma handbook : a complete guide for green belts, black belts, and managers at all levels , 2014 .

[15]  D. C. Krueger,et al.  Six Sigma implementation: a qualitative case study using grounded theory , 2014 .

[16]  Jose Arturo Garza-Reyes,et al.  A DMAIRC approach to lead time reduction in an aerospace engine assembly process , 2014 .

[17]  Sameer Kumar,et al.  Using Six Sigma DMAIC to improve credit initiation process in a financial services operation , 2008 .

[18]  Manoj Kumar Tiwari,et al.  An application of Six Sigma methodology to reduce the engine-overheating problem in an automotive company , 2005 .

[19]  Ron Basu,et al.  Implementing Six Sigma and Lean , 2008 .

[20]  Mikel J Harry Practitioner's guide for statistics and lean six sigma for process improvement , 2010 .

[21]  Jhareswar Maiti,et al.  Data mining driven DMAIC framework for improving foundry quality – a case study , 2014 .

[22]  Elizabeth A. Cudney,et al.  Lean Systems : Applications and Case Studies in Manufacturing, Service, and Healthcare , 2013 .

[23]  Jose Arturo Garza-Reyes,et al.  Lean road transportation – a systematic method for the improvement of road transport operations , 2016 .

[24]  Rajab Abdullah Hokoma,et al.  The present status of quality and manufacturing management techniques and philosophies within the Libyan iron and steel industry , 2010 .

[25]  Sami Farooq,et al.  An action research methodology for manufacturing technology selection: a supply chain perspective , 2015 .

[26]  Jose Arturo Garza-Reyes,et al.  A lean thinking and simulation-based approach for the improvement of routing operations , 2016, Ind. Manag. Data Syst..

[27]  Alan Bryman,et al.  Research Methods and Organization Studies , 1989 .

[28]  C. Arsene,et al.  Quality improvement. , 2015, Nursing management.

[29]  Jiju Antony,et al.  Six-sigma for improving Top-Box Customer Satisfaction score for a banking call centre , 2015 .

[30]  David M. McCutcheon,et al.  Conducting case study research in operations management , 1993 .

[31]  Andy Neely,et al.  Six Sigma – Friend or Foe ? , 2003 .

[32]  Gavin T. L. Brown,et al.  Mixing interview and questionnaire methods: Practical problems in aligning data , 2010 .

[33]  R. R. Lakhe,et al.  An innovative model of Six Sigma for SMEs: the T-DMAIC model , 2009 .

[34]  Prasanta Kumar Dey,et al.  Strategic supplier performance evaluation: a case-based action research of a UK manufacturing organisation , 2015 .

[35]  Maneesh Kumar,et al.  Six sigma in service organisations: Benefits, challenges and difficulties, common myths, empirical observations and success factors , 2007 .

[36]  Sri Indrawati,et al.  Manufacturing Continuous Improvement Using Lean Six Sigma: An Iron Ores Industry Case Application☆ , 2015 .

[37]  Thong Ngee Goh,et al.  Comprehensive Six Sigma application: a case study , 2014 .

[38]  Mohan V. Tatikonda,et al.  Role of explicit and tacit knowledge in Six Sigma projects: An empirical examination of different project sucess , 2010 .

[39]  K. Tan,et al.  The current state of six sigma application in services , 2007 .

[40]  T. Bortolotti,et al.  Successful lean implementation: Organizational culture and soft lean practices , 2015 .

[41]  R. Cagliano,et al.  Collaborative improvement in the extended manufacturing enterprise: lessons from an action research process , 2005 .

[42]  Sandra Furterer Lean Six Sigma in Service : Applications and Case Studies , 2009 .

[43]  J. Osborne Improving your data transformations: Applying the Box-Cox transformation , 2010 .

[44]  Jrjung Lyu,et al.  A Lean Six-Sigma approach to touch panel quality improvement , 2009 .

[45]  Luiz Felipe Scavarda,et al.  Evolution of the performance measurement system in the Logistics Department of a broadcasting company: An action research , 2015 .

[46]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[47]  John Antonakis,et al.  Can standard operating procedures be motivating? Reconciling process variability issues and behavioural outcomes1 , 2005 .

[48]  Jose Arturo Garza-Reyes,et al.  A Six Sigma and DMAIC application for the reduction of defects in a rubber gloves manufacturing process , 2014 .

[49]  S. Zailani,et al.  Structural equation modelling on knowledge creation in Six Sigma DMAIC project and its impact on organizational performance , 2015 .

[50]  Jose Arturo Garza-Reyes,et al.  An empirical application of Six Sigma and DMAIC methodology for business process improvement , 2010 .

[51]  Joyce Fortune Idea Generation Techniques for Quality Improvement , 1992 .

[52]  Gunnar Stefansson,et al.  Applying a lean approach to identify waste in motor carrier operations , 2012 .

[53]  S. Vinodh,et al.  Implementing lean sigma in an Indian rotary switches manufacturing organisation , 2014 .

[54]  C. R. Gowen III,et al.  Simultaneous implementation of Six Sigma and knowledge management in hospitals , 2008 .

[55]  Robert Pellerin,et al.  Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system , 2016 .

[56]  J. Bicheno The New Lean Toolbox: Towards Fast, Flexible Flow , 2008 .

[57]  Manoj Kumar Tiwari,et al.  Implementing the Lean Sigma framework in an Indian SME: a case study , 2006 .

[58]  J. de Mast,et al.  A methodological comparison of three strategies for quality improvement , 2004 .

[59]  Arnaldo Dias Belchior,et al.  Implementing Causal Analysis and Resolution in Software Development Projects: The MiniDMAIC Approach , 2008, 19th Australian Conference on Software Engineering (aswec 2008).

[60]  Greg Brue,et al.  Six Sigma For Managers , 2002 .

[61]  W. Shadish,et al.  Experimental and Quasi-Experimental Designs for Generalized Causal Inference , 2001 .

[62]  Thomas Pyzdek,et al.  The Six Sigma Handbook , 2000 .