A Cost Adjustment Heuristic for Dynamic Lot-Sizing with Uncertain Demand Timing
暂无分享,去创建一个
We define a new heuristic, based on the adjustment of set-up costs, for the dynamic lot-sizing problem when demand timing is uncertain. Using a range of simulated problems, we compare the performance of this cost adjustment heuristic with that of a safety lead time heuristic, Zangwill's deterministic algorithm, which ignores uncertainty, and the optimal solution. Results show that the safety lead time heuristic works well for problems with high shortage costs and high probability of early demands, but poorly in other circumstances. The cost adjustment heuristic is quite robust, generally exceeds the performance of the safety lead time approach, and is relatively insensitive to variations in uncertainty.
[1] D. Clay Whybark,et al. MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .
[2] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[3] Christopher H. Nevison,et al. Dynamic Lot-Sizing When Demand Timing Is Uncertain , 1984, Oper. Res..