Teaching teamwork in design: a framework for understanding effectiveness in student teams

This chapter proposes an Input-Process-Output framework for understanding what impacts the effectiveness of teamwork when higher education students are collaborating on design assignments. Theframework can help design educators integrate teamwork into their courses and better evaluate learning outcomes, and may also elucidate good practice for professional design teams. Explaining the genesis ofthe framework, the literature is assimilated on team effectiveness and predictors of team performance, including: definitions, dimensions and frameworks of team effectiveness in contexts far wider than designeducation. Informed by the challenges specific to teaching design, a 22-factor framework is proposed. The paper concludes with recommendations for teachers informed by the framework. The viability ofthe 22-factor model of team effectiveness is evidenced by national surveys across Australia, which are reported in summary here.

[1]  Teaching Groups to Become Teams , 2000 .

[2]  Kim A. Stewart,et al.  Exploring Predictors of Student Team Project Performance , 1998 .

[3]  Annelies E. M. Van Vianen,et al.  Managing relationship conflict and the effectiveness of organizational teams , 2001 .

[4]  R. Peterson,et al.  Task Conflict snd Relationship Conflict in Top Management Teams:The Pivotal Role of Intragroup Trust. , 1998 .

[5]  D. L. Gladstein Groups in context: A model of task group effectiveness. , 1984 .

[6]  Gina J. Medsker,et al.  RELATIONS BETWEEN WORK TEAM CHARACTERISTICS AND EFFECTIVENESS: A REPLICATION AND EXTENSION , 1996 .

[7]  John H. Bradley,et al.  The effect of personality type on team performance , 1997 .

[8]  Scott B. MacKenzie,et al.  Organizational Citizenship Behavior and the Quantity and Quality of Work Group Performance , 1997, The Journal of applied psychology.

[9]  Imad H. Elhajj,et al.  Turning Student Groups into Effective Teams , 2004 .

[10]  Jule B. Gassenheimer,et al.  Exploring the “Lone Wolf” Phenomenon in Student Teams , 2005 .

[11]  K. Freeman Attitudes toward Work in Project Groups as Predictors of Academic Performance , 1996 .

[12]  K. Eisenhardt,et al.  Exploring the Black Box: An Analysis of Work Group Diversity, Conflict and Performance , 1999 .

[13]  D. S. Jalajas,et al.  Feuds in Student Groups: Coping with Whiners, Martyrs, Saboteurs, Bullies, and Deadbeats , 1984 .

[14]  Andrew Litchfield,et al.  Supporting peer assessment of individual contributions in groupwork , 2007 .

[15]  E. Mannix,et al.  The critical role of conflict resolution in teams: a close look at the links between conflict type, conflict management strategies, and team outcomes. , 2008, The Journal of applied psychology.

[16]  Jeremy Busby,et al.  Error and distributed cognition in design , 2001 .

[17]  A. Ingham,et al.  The Ringelmann effect: Studies of group size and group performance , 1974 .

[18]  Narda R. Quigley,et al.  A Longitudinal Study of Team Conflict, Conflict Management, Cohesion, and Team Effectiveness , 2009 .

[19]  Eduardo Salas,et al.  The Effect of Team Building on Performance , 1999 .

[20]  Richard M. Felder,et al.  The Comprehensive Assessment of Team Member Effectiveness: Development of a Behaviorally Anchored Rating Scale for Self and Peer Evaluation , 2012 .

[21]  K. Jehn A Multimethod Examination of the Benefits and Detriments of Intragroup Conflict , 1995 .

[22]  Randall S. Hansen,et al.  Benefits and Problems With Student Teams: Suggestions for Improving Team Projects , 2006 .

[23]  Judy Goldfinch,et al.  DEVELOPMENT OF A PEER ASSESSMENT TECHNIQUE FOR OBTAINING INDIVIDUAL MARKS ON A GROUP PROJECT , 1990 .

[24]  Claudia Eckert,et al.  Dimensions of communication in design , 2001 .

[25]  Susan Brown Feichtner,et al.  Why Some Groups Fail: a Survey of Students' Experiences with Learning Groups , 1984 .

[26]  Jon M. Pearce,et al.  PRAZE: Innovating teaching through online peer review , 2007 .

[27]  Richard E. Yellen,et al.  Extraversion and introversion in electronically-supported meetings , 1995, Inf. Manag..

[28]  Mark Klein,et al.  Supporting conflict resolution in cooperative design systems , 1991, IEEE Trans. Syst. Man Cybern..

[29]  Shen-Guan Shih,et al.  A game theory-based approach to the analysis of cooperative learning in design studios , 2006 .

[30]  Isabelle M. M. J. Reymen,et al.  Personality and team performance: a meta‐analysis , 2006 .

[31]  Dow Scott,et al.  Teams: Why some succeed and others fail , 1994 .

[32]  S. Stumpf,et al.  Talking about team framing: using argumentation to analyse and support experiential learning in early design episodes , 2002 .

[33]  E. Sundstrom,et al.  Work teams: Applications and effectiveness. , 1990 .

[34]  Narasimhaiah Gorla,et al.  Who should work with whom?: building effective software project teams , 2004, CACM.

[35]  T. Ruddy,et al.  AN EXAMINATION OF THE RELATIONSHIP BETWEEN WORK GROUP CHARACTERISTICS AND PERFORMANCE: ONCE MORE INTO THE BREECH , 1997 .

[36]  David G. Dobolyi,et al.  The Scientific Status of Learning Styles Theories , 2015 .

[37]  Sharon J. Korth,et al.  A Framework for Learning to Work in Teams. , 1998 .

[38]  J. A. Mello Improving Individual Member Accountability in Small Work Group Settings , 1993 .

[39]  Matthew W. Ohland,et al.  Development of a Theory-Based Assessment of Team Member Effectiveness , 2007 .

[40]  Ac Rianne Valkenburg,et al.  The reflective practice of design teams , 1998 .

[41]  Kim A. Stewart,et al.  Lessons from the Best and Worst Student Team Experiences: How a Teacher can make the Difference , 1999 .

[42]  Atreyi Kankanhalli,et al.  Conflict and Performance in Global Virtual Teams , 2006, J. Manag. Inf. Syst..

[43]  Clinton O. Longenecker,et al.  Quality Improvement through Team Goal Setting, Feedback, and Problem Solving , 1994 .

[44]  Ann Walker,et al.  British Psychology Students' Perceptions of Group-Work and Peer Assessment , 2001 .

[45]  P. Ghodous,et al.  Conflict mitigation in collaborative design , 2006 .

[46]  Hulya Julie Yazici,et al.  A study of collaborative learning style and team learning performance , 2005 .

[47]  Dawn R. Deeter-Schmelz,et al.  Enriching Our Understanding of Student Team Effectiveness , 2002 .

[48]  Rianne Valkenburg Shared understanding as a condition for team design , 1998 .

[49]  R. W. Brown Autorating: getting individual marks from team marks and enhancing teamwork , 1995, Proceedings Frontiers in Education 1995 25th Annual Conference. Engineering Education for the 21st Century.

[50]  Karola von Baggo,et al.  Journal of Information Technology Education Predictors of Team Work Satisfaction Predictors of Team Work Satisfaction Literature Review , 2022 .

[51]  A. Denisi,et al.  The impact of ratee's disability on performance judgments and choice as partner: The role of disability–job fit stereotypes and interdependence of rewards. , 1998 .

[52]  K. W. Carsten,et al.  Productive conflict: The importance of conflict management and conflict issue. , 1997 .

[53]  K. Jehn A qualitative analysis of conflict types and dimensions in , 1997 .

[54]  Daniel R. Ilgen,et al.  Enhancing the Effectiveness of Work Groups and Teams , 2006, Psychological science in the public interest : a journal of the American Psychological Society.

[55]  Richard Tucker,et al.  Teaching and Learning in Collaborative Group Design Projects , 2006 .

[56]  Petra Badke-Schaub,et al.  Thinking in design teams - an analysis of team communication , 2002 .

[57]  Miriam Erez,et al.  Effect of goal acceptance on the relationship of goal difficulty to performance , 1984 .

[58]  Yuk Kuen Wong,et al.  Experience, gender composition, social presence, decision process satisfaction and group performance , 2004 .

[59]  Roger W. Reinsch,et al.  Teaching Teamwork and Problem Solving Concurrently , 2008 .

[60]  Petra Badke-Schaub,et al.  Analysing and modelling cooperative design by the critical situation method , 2002 .

[61]  K. Topping Peer Assessment Between Students in Colleges and Universities , 1998 .

[62]  H. Christiaans Creativity as a Design Criterion , 2002 .

[63]  Kathy Brittain White,et al.  MIS Project Teams: An Investigation of Cognitive Style Implications , 1984, MIS Q..

[64]  Patricia Huddleston,et al.  Does It Matter if I Hate Teamwork? What Impacts Student Attitudes toward Teamwork , 2003 .

[65]  Kenneth J. Chapman,et al.  Creating Positive Group Project Experiences: An Examination of the Role of the Instructor on Students’ Perceptions of Group Projects , 2001 .

[66]  E. Cohen Restructuring the Classroom: Conditions for Productive Small Groups , 1994 .

[67]  E. Salas,et al.  Team building and its influence on team effectiveness: An examination of conceptual and empirical developments. , 1992 .

[68]  Phil Davies,et al.  Computerized Peer Assessment , 2000 .

[69]  Daniel Forgues,et al.  Teamwork in Integrated Design Projects: Understanding the Effects of Trust, Conflict, and Collaboration on Performance , 2011 .

[70]  Brian E. Mennecke,et al.  Teams and Tasks , 2003 .

[71]  D. Harrison,et al.  Time, Teams, and Task Performance: Changing Effects of Surface- and Deep-Level Diversity on Group Functioning , 2002 .

[72]  Michael A. West,et al.  Individual, Climate, and Group Interaction Processes as Predictors of Work Team Innovation , 1995 .

[73]  Isabelle M. M. J. Reymen,et al.  Designing in Teams , 2008 .

[74]  Gina J. Medsker,et al.  RELATIONS BETWEEN WORK GROUP CHARACTERISTICS AND EFFECTIVENESS: IMPLICATIONS FOR DESIGNING EFFECTIVE WORK GROUPS , 1993 .

[75]  Jo McKenzie,et al.  SPARK, a confidential web-based template for self and peer assessment of student teamwork: benefits of evaluating across different subjects , 2002, Br. J. Educ. Technol..

[76]  Claudia J. Ferrante,et al.  Getting More out of Team Projects: Incentivizing Leadership to Enhance Performance , 2006 .

[77]  S. G. Cohen,et al.  What Makes Teams Work: Group Effectiveness Research from the Shop Floor to the Executive Suite , 1997 .

[78]  David A. Kravitz,et al.  Ringelmann rediscovered: the original article , 1986 .

[79]  Charles M. Brooks,et al.  Free Riding in Group Projects and the Effects of Timing, Frequency, and Specificity of Criteria in Peer Assessments , 2003 .

[80]  Rolph E. Anderson,et al.  Free-Riding in Group Projects: Control Mechanisms and Preliminary Data , 1990 .

[81]  Dwight D. Frink,et al.  A Review of the Influence of Group Goals on Group Performance , 1994 .

[82]  E. A. Locke,et al.  Work Motivation and Satisfaction: Light at the End of the Tunnel , 1990 .

[83]  Richard Tucker,et al.  The architecture of teamwork: examining relationships between teaching, assessment, student learning and satisfaction with creative design outcomes , 2015 .