Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems
暂无分享,去创建一个
[1] Jatinder N. D. Gupta,et al. A Functional Heuristic Algorithm for the Flowshop Scheduling Problem , 1971 .
[2] Mark Stevenson,et al. A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .
[3] Jiyin Liu,et al. The impact of neighbourhood size on the process of simulated annealing: computational experiments on the flowshop scheduling problem , 1999 .
[4] Andreas Größler,et al. System Dynamics as a Structural Theory in Operations Management , 2008 .
[5] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[6] Jose M. Framinan,et al. The CONWIP production control system: Review and research issues , 2003 .
[7] Cees Duin,et al. Looking Ahead with the Pilot Method , 2005, Ann. Oper. Res..
[8] John D. Sterman,et al. System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .
[9] Martha Lair Sale,et al. Survey-based comparison of performance and change in performance of firms using traditional manufacturing, JIT and TOC , 2003 .
[10] D. Kehoe,et al. Internet based supply chain management: A classification of approaches to manufacturing planning and control , 2001 .
[11] Christian Schmitz,et al. Optimal product mix decisions based on the theory of constraints? exposing rarely emphasized premises of throughput accounting , 2005 .
[12] N. Singh,et al. Modelling and Analysis of Just‐in‐Time Manufacturing Systems: A Review , 1992 .
[13] Cristovao Silva,et al. Three decades of workload control research: a systematic review of the literature , 2011 .
[14] V. J. Mabin,et al. The performance of the theory of constraints methodology: Analysis and discussion of successful TOC applications , 2003 .
[15] J. Sterman. Business Dynamics , 2000 .
[16] M. Held,et al. A dynamic programming approach to sequencing problems , 1962, ACM National Meeting.
[17] Jeff Cox,et al. The Goal: A Process of Ongoing Improvement , 1984 .
[18] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[19] Michael J. Shaw,et al. A neural-net approach to real time flow-shop sequencing , 2000 .
[20] D. Sterman,et al. Misperceptions of Feedback in a Dynamic Decision Making Experiment , 1989 .
[21] V. Selladurai,et al. The effect of the drum-buffer-rope (DBR) approach on the performance of a synchronous manufacturing system (SMS) , 2000 .
[22] Jwm Will Bertrand,et al. Production control in engineer-to-order firms , 1993 .
[23] A. Hertz,et al. A new heuristic method for the flow shop sequencing problem , 1989 .
[24] Jan Riezebos. Design of POLCA material control systems , 2010 .
[25] Timothy D. Fry,et al. Comparisons between drum–buffer–rope and material requirements planning: a case study , 2005 .
[26] Paul M. Bobrowski,et al. Job release and labor flexibility in a dual resource constrained job shop , 1989 .
[27] D. C. Page,et al. Queuing network analysis approach for estimating the sizes of the time buffers in Theory of Constraints-controlled production systems , 2004 .
[28] Dritan Nace,et al. Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage , 2012, Comput. Oper. Res..
[29] Ihsan Sabuncuoglu,et al. Analysis of order review/release problems in production systems , 1999 .
[30] C. Carl Pegels,et al. Application of the theory of constraints to a bottleneck operation in a manufacturing plant , 2005 .
[31] Mahesh Gupta,et al. Comparing TOC with MRP and JIT: a literature review , 2009 .
[32] Alan Frieze,et al. A new integer programming formulation for the permutation flowshop problem , 1989 .
[33] Martin Land,et al. Improving a practical DBR buffering approach using Workload Control , 2003 .
[34] Michael S. Spencer,et al. The impact of a constraint buffer in a flow shop , 1995 .
[35] Jung Woo Jung,et al. Flowshop-scheduling problems with makespan criterion: a review , 2005 .
[36] Rong-Kwei Li,et al. CONSTRAINT TIME BUFFER DETERMINATION MODEL , 1998 .
[37] E. Schragenheim,et al. Process flow industry—scheduling and control using theory of constraints , 1994 .
[38] Zinovy D. Radovilsky. A quantitative approach to estimate the size of the time buffer in the theory of constraints , 1998 .
[39] Pisal Yenradee,et al. Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation , 2006 .
[40] Boaz Ronen,et al. Focused management in military organizations: an avenue for future industrial engineering , 1994 .
[41] Ling Wang,et al. An Effective Hybrid Heuristic for Flow Shop Scheduling , 2003 .
[42] Eliyahu M. Goldratt,et al. Computerized shop floor scheduling , 1988 .
[43] Patroklos Georgiadis,et al. Production Planning and Control in Flow Shop Operations Using Drum Buffer Rope Methodology: A System Dynamics Approach , 2008 .
[44] Satya S. Chakravorty,et al. Impact of scheduling free goods on the throughput performance of a manufacturing operation , 2004 .
[45] S S Mahapatra,et al. Application of Theory of Constraints on Scheduling of Drum-buffer-rope System , 2006 .
[46] D. S. Palmer. Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum , 1965 .
[47] Wendell G. Gilland. A simulation study comparing performance of CONWIP and bottleneck-based release rules , 2002 .
[48] James F. Cox,et al. Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models , 2009 .
[49] Frederick S. Hillier,et al. Introduction of Operations Research , 1967 .
[50] Zhihong Jin,et al. Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem , 2006 .
[51] V. D. R. Guide. Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .
[52] Chandrasekharan Rajendran,et al. Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs , 2004, Eur. J. Oper. Res..
[53] Colin R. Reeves,et al. A genetic algorithm for flowshop sequencing , 1995, Comput. Oper. Res..
[54] T. Ye,et al. Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems , 2008 .
[55] J. Grabowski,et al. On Flow Shop Scheduling with Release and Due Dates to Minimize Maximum Lateness , 1983 .
[56] Patroklos Georgiadis,et al. Production , Manufacturing and Logistics Real-time production planning and control system for job-shop manufacturing : A system dynamics analysis , 2011 .
[57] Wilbert E. Wilhelm,et al. Scheduling and lot sizing with sequence-dependent setup: A literature review , 2006 .
[58] M. Aryanezhad,et al. An improved algorithm for optimizing product mix under the theory of constraints , 2004 .
[59] John S. Morris,et al. A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing , 1994 .
[60] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[61] R. Cagliano,et al. E‐business strategy , 2003 .
[62] Timothy D. Fry,et al. ORDER REVIEW/RELEASE AND LOT SPLITTING IN DRUM-BUFFER-ROPE , 1997 .
[63] Andreas C. Nearchou,et al. A novel metaheuristic approach for the flow shop scheduling problem , 2004, Eng. Appl. Artif. Intell..
[64] Mahesh Gupta,et al. Constraints management--recent advances and practices , 2003 .