Buffer allocation plan for a remanufacturing cell

[1]  D. Heyman Optimal disposal policies for a single‐item inventory system with returns , 1977 .

[2]  Guy Pujolle,et al.  Isolation Method in a Network of Queues , 1980, IEEE Transactions on Software Engineering.

[3]  John A. Muckstadt,et al.  An analysis of single item inventory systems with returns , 1981 .

[4]  J. MacGregor Smith,et al.  The generalized expansion method for open finite queueing networks , 1987 .

[5]  James MacGregor Smith,et al.  Asymptotic behavior of the expansion method for open finite queueing networks , 1988, Comput. Oper. Res..

[6]  William L. Maxwell,et al.  The Role of Work-in-Process Inventory in Serial Production Lines , 1988, Oper. Res..

[7]  James MacGregor Smith,et al.  Buffer Space Allocation in Automated Assembly Lines , 1988, Oper. Res..

[8]  Madhan Shridhar Phadke,et al.  Quality Engineering Using Robust Design , 1989 .

[9]  M. S. Phadke,et al.  Quality Engineering using Design of Experiments , 1989 .

[10]  Kelvin C. W. So,et al.  The effect of the coefficient of variation of operation times on the allocation of storage space in , 1991 .

[11]  Sushant Jain,et al.  Open finite queueing networks with M/M/C/K parallel servers , 1994, Comput. Oper. Res..

[12]  Surendra M. Gupta,et al.  Operations Planning Issues in an Assembly/Disassembly Environment , 1994 .

[13]  Yushin Hong,et al.  Heuristic algorithms for buffer allocation in a production line with unreliable machines , 1995 .

[14]  Marc Salomon,et al.  Strategic Issues in Product Recovery Management , 1995 .

[15]  Charles R. McLean,et al.  Disassembly of products , 1996 .

[16]  Erwin van der Laan,et al.  Product remanufacturing and disposal: A numerical comparison of alternative control strategies , 1996 .

[17]  E. A. van deLaan,et al.  An (s,Q) inventory model with remanufacturing and disposal , 1996 .

[18]  Surendra M. Gupta,et al.  Disassembly of multiple product structures , 1997 .

[19]  V D R Guide,et al.  Buffering from material recovery uncertainty in a recoverable manufacturing environment , 1997 .

[20]  Yeong-Dae Kim,et al.  Algorithms for determining capacities of individual buffers in assembly/disassembly systems , 1997 .

[21]  Surendra M. Gupta,et al.  ENVIRONMENTAL CONCERNS AND RECYCLING/DISASSEMBLY EFFORTS IN THE ELECTRONICS INDUSTRY , 1997 .

[22]  Surendra M. Gupta,et al.  Disassembly of complex product structures with parts and materials commonality , 1997 .

[23]  James MacGregor Smith,et al.  Buffer allocation for an integer nonlinear network design problem , 1997, Comput. Oper. Res..

[24]  George A. Vouros,et al.  Buffer allocation in unreliable production lines using a knowledge based system , 1998, Comput. Oper. Res..

[25]  D. Clay Whybark,et al.  Inventory and capacity trade-offs in a manufacturing cell , 1999 .

[26]  John H. Harris,et al.  An algorithm for optimal buffer placement in reliable serial lines , 1999 .

[27]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[28]  Surendra M. Gupta,et al.  ANALYSIS OF DESIGN EFFICIENCY FOR THE DISASSEMBLY OF MODULAR ELECTRONIC PRODUCTS , 1999 .

[29]  Surendra M. Gupta,et al.  Analysis of manufacturing flow lines with unreliable machines , 1999, Int. J. Comput. Integr. Manuf..

[30]  JOHN H. HARRIS,et al.  An algorithm for optimal buffer placement in reliable serial lines , 1999 .

[31]  Surendra M. Gupta,et al.  Production systems with interruptions, arbitrary topology and finite buffers , 2000, Ann. Oper. Res..

[32]  Surendra M. Gupta,et al.  Disassembly line in product recovery , 2002 .

[33]  Alfred J.D. Lambert,et al.  Demand-driven disassembly optimization for electronic products , 2002 .

[34]  Surendra M. Gupta,et al.  A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS , 2002 .