Cost Overrun Assessment Model in Highway Construction Projects Using Fuzzy Uncertainty Analysis
暂无分享,去创建一个
[1] Hemanta Doloi,et al. Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects , 2013 .
[2] Aminah Robinson Fayek,et al. Fuzzy Numbers in Cost Range Estimating , 2007 .
[3] Murat Gunduz,et al. Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects , 2015 .
[4] Yehiel Rosenfeld,et al. Root-Cause Analysis of Construction-Cost Overruns , 2014 .
[5] Intan Rohani Endut,et al. Cost overrun in the Malaysian construction industry projects: A deeper insight , 2014 .
[6] Geoffrey Qiping Shen,et al. Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects , 2016 .
[7] Abdullah Alhomidan. Factors Affecting Cost Overrun in Road Construction Projects in Saudi Arabia , 2013 .
[8] Nabil Ibrahim El Sawalhi. Modeling the Parametric Construction Project Cost Estimate using Fuzzy Logic , 2012 .
[9] George J. Klir,et al. Fuzzy sets and fuzzy logic - theory and applications , 1995 .
[10] Arazi Idrus,et al. Development of project cost contingency estimation model using risk analysis and fuzzy expert system , 2011, Expert Syst. Appl..
[11] Vachara Peansupap,et al. Identifying Issues of Change Leading to Cost Conflicts: Case Study in Cambodia☆ , 2015 .